laitimes

The starting price is 747 million yuan, and Qingpu plans to list and sell 2 pieces of land for commercial services and business offices

author:Daqingpu room talk
Abstract: Qingpu District plans to list and sell 2 pieces of land for commercial services and business offices, with a total transfer area of 201 mu and a total starting price of 747 million yuan. The plot is located in the main urban area of Hongqiao and the living room of the water town.
The starting price is 747 million yuan, and Qingpu plans to list and sell 2 pieces of land for commercial services and business offices

Recently, the announcement on the transfer of the right to use state-owned construction land in Shanghai (Hu Xue Zi [2024] No. 040) was released, and the two plots are from Qingpu District.

The starting price is 747 million yuan, and Qingpu plans to list and sell 2 pieces of land for commercial services and business offices

The two plots to be listed for sale in Qingpu District this time belong to Xujing Town and Jinze Town at the east and west ends of Qingpu Mountain. They are plots 25-07 on the east side of Panlong Road in West Hongqiao, plots 01-02-01, 01-03-01, 01-03-05, 01-04-01 in the living room of Jinze Town, and 01-02-09 public green space, and the underground space of Planning 30th Road.

It is used for commercial services, business offices and other land. The total planned transfer area is as high as 134,239.98 square meters (about 201 acres), and the starting price is 747 million yuan.

Let's take a closer look:

1. Lot 25-07 on the east side of Panlong Road, West Hongqiao, Qingpu District

The starting price is 747 million yuan, and Qingpu plans to list and sell 2 pieces of land for commercial services and business offices

Plot 25-07 on the east side of Panlong Road in West Hongqiao is located in the main urban area of Hongqiao.

The starting price is 747 million yuan, and Qingpu plans to list and sell 2 pieces of land for commercial services and business offices

Plot 4 to: east to plot 25-08, west to Panlong Road, south to Panzhong Road, north to plot 25-06.

Transfer area: 21,424.70 square meters

Nature of land use: commercial land, office buildings, catering and hotel land

Lease period: 40 years for commercial land, 50 years for office buildings, 40 years for catering and hotel land

Plot ratio: 2.1

Building height: 80 meters

Starting price: 413.030 million yuan (about 413 million yuan)

Starting floor price: 9180 yuan / square meter

The starting price of the land is 413 million yuan. The starting floor price is 9,180 yuan/square meter, which is close to the historical transaction floor price of similar land in this sector.

According to the "transfer documents" of the plot, commercial service buildings account for 20% (including hotels), and commercial office buildings account for 80%.

The starting price is 747 million yuan, and Qingpu plans to list and sell 2 pieces of land for commercial services and business offices

Aerial view of the project

In accordance with the requirements of the "Overall Plan for the Construction of Hongqiao International Development Hub", the "14th Five-Year Plan" for the Central Business District of Hongqiao International Open Hub and the "14th Five-Year Plan for the Development and Construction of West Hongqiao Business District", it is recommended to introduce digital technology and fashion creative headquarters enterprises.

So, what kind of company will be introduced?

The starting price is 747 million yuan, and Qingpu plans to list and sell 2 pieces of land for commercial services and business offices

Location analysis map

In the location analysis map of the project plan provided by the official "hidden mystery" (see attached map for details), in this location analysis map, "Bosideng Headquarters" is written above the project location (SITE).

The location map shows that the project is located in the sub-central section of the planned main urban area of Hongqiao.

The starting price is 747 million yuan, and Qingpu plans to list and sell 2 pieces of land for commercial services and business offices

Project renderings

The design concept also mentions that the "Feather Universe" takes the structure and form of the feather as the starting point to fully show its unique image and personality.

In January this year, Qingpu official media mentioned in a report that in the past year, 12 new headquarters including Bosideng and 3Trees have been added in the Qingpu area of Hongqiao Business District, bringing the total number to 92.

To sum up, we judge that the project plot will introduce the down jacket king "Bosideng".

The starting price is 747 million yuan, and Qingpu plans to list and sell 2 pieces of land for commercial services and business offices

Project function distribution

In addition, the "transfer document" also mentions that the transferee needs to set up a hotel with an above-ground construction area of not less than 4,271 square meters.

In other words, the project is mainly based on headquarters office, and is supported by some commercial and hotel functions.

In the future, the project will also set up no less than 500 square meters of sports facilities and no less than 500 square meters of conference center.

The "transfer document" requires that the single area of the commercial office building shall not be less than 1,000 square meters, the minimum separation area of the single room (set) of the business office shall not be less than 600 square meters, and the proportion of the separation area of the commercial building above 150 square meters shall not be less than 80% of the commercial construction area (the above-ground and underground businesses shall meet this requirement respectively, excluding hotels).

In addition, the "transfer document" also puts forward specific requirements for self-owned properties:

(1) The transferee shall hold all commercial properties, including hotel properties, according to the term of the transfer.

(2) The transferee shall hold the office property with a construction area of not less than 50% (17,996.74 square meters) according to the transfer period.

(3) 60% of the transferable office properties in the parcel under this contract can be directly transferred to relevant enterprises in line with the regional industry orientation, and the consent of the Shanghai Qingpu District Commission of Commerce shall be obtained before the re-transfer of such part of the property, and the consent of the Shanghai Qingpu District Commission of Commerce shall be obtained before the transfer of the remaining 40% of the transferable office properties.

The starting price is 747 million yuan, and Qingpu plans to list and sell 2 pieces of land for commercial services and business offices

Project overview and indicators

The starting price is 747 million yuan, and Qingpu plans to list and sell 2 pieces of land for commercial services and business offices

Analysis of the surrounding business formats of the project

2. Plots 01-02-01, 01-03-01, 01-03-05, 01-04-01 and 01-02-09 public green space and planned underground space of 30 Road in the living room of Jinze Town, Qingpu District

The starting price is 747 million yuan, and Qingpu plans to list and sell 2 pieces of land for commercial services and business offices

In the same period, another plot to be listed for sale is located in the core area of the Yangtze River Delta Integration Demonstration Zone, that is, the "creative engine" of the living room plate of Jinze Town, Qingpu District, that is, the "one heart" in "one point, one heart, and one park". It is the core project of the water town living room, the main industrial and living functional area of the central activity area, creating a demonstration and leading window for high-quality development, creating a new Jiangnan water town courtyard with the ancient, and establishing an integrated practice area with the coordination of the three places.

The starting price is 747 million yuan, and Qingpu plans to list and sell 2 pieces of land for commercial services and business offices

The Chuangzhi Engine Plate is located in Jinze Town, Qingpu District, Shanghai, in the northeast corner of the "One Heart" three groups, with National Highway 318 in the southeast, Jiangnan Polder Exhibition Park in the north, and Yuandang Water System in the west, facing the Science and Technology Innovation School Park across the water.

The proposed land area is about 116.62 acres. Counting the underground space, the total transfer area is 112,815.28 square meters (including 77,712.4 square meters above ground and 79,158.78 square meters underground).

Specific planning indicators of 4 plots:

Site area: 6776 square meters (10.2 acres)

Nature of land use: land for commercial services

Plot ratio: 2.0

Building height: 24 meters

Site area: 27,640 square meters (41.46 acres)

Nature of land use: commercial service land (80%), business office comprehensive land (20%)

Plot ratio: 2.5

Building height: 30 m

According to the "transfer document", as an important entrance to the "One Point One Heart" area (Kanazawa part), one landmark building should be set up on the plot 01-03-01 to enhance the regional image and strengthen the landscape experience of the area. It also includes a public transport hub with a construction area of 3,000 square meters, a public toilet of 60 square meters, and 150 public parking spaces. )

Site area: 9642 square meters (14.46 acres)

Nature of land use: land for commercial services

Plot ratio: 1.2

Building height: 18 meters

Site area: 33,638 square meters (50.5 acres)

Nature of land: commercial office land

Plot ratio: 1.5

Building height: 24 meters

The term of the above-mentioned land transfer is 40 years for commercial service land and 50 years for business office land.

The starting price of the packaged land is 334.45 million yuan (about 234 million yuan).

The starting price is 747 million yuan, and Qingpu plans to list and sell 2 pieces of land for commercial services and business offices

In addition, the "transfer document" also requires that the single floor area of a commercial office building shall not be less than 600 square meters, the minimum separation area of a single business office room (set) shall not be less than 300 square meters, and the proportion of a commercial building with a separation area of more than 150 square meters shall not be less than 80% of the commercial construction area.

In terms of building energy consumption, the buildings in the parcel should meet the standard of no less than three-star green buildings, and no less than 70% of the buildings on the ground should be near-zero energy buildings. The project shall implement renewable energy solar photovoltaic design, and the photovoltaic installation area shall not be less than 50% of the total roof area.

The starting price is 747 million yuan, and Qingpu plans to list and sell 2 pieces of land for commercial services and business offices

The "transfer document" also puts forward specific requirements for self-owned properties:

1. The transferee shall hold the commercial property with a construction area of not less than 80% (more than 64,317.60 square meters) for not less than 20 years from the date of passing the comprehensive acceptance of the project planning land;

2. The transferee shall hold the office property with a construction area of not less than 40% (more than 25,721.70 square meters) for not less than 20 years from the date of passing the comprehensive acceptance of the project planning land.

The starting price is 747 million yuan, and Qingpu plans to list and sell 2 pieces of land for commercial services and business offices

Last year, two pieces of land for education, scientific research and design (01-02-06 and 01-02-08) at the north end of the Chuangzhi Engine plate were listed for sale, and the official unit of the demonstration zone, the Yangtze River Delta Integration Demonstration Zone New Development and Construction Co., Ltd., won it with 45.88 million yuan.

The time of the listing and sale of the two plots is the same:

Listing start time: 09:30 on May 11, 2024.

Listing deadline: 09:30 on May 21, 2024, and the listing deadline will be presided over by the listing host.

In addition, we previously reported that the 29-01 plot on the east side of Jing'an Road in Xujing Beidaju Community will hold a transfer event on the 24th of this month, and a modern vegetable farm will be built.

Extended reading:

(The above interpretation is for reference only, please refer to the official announcement.) )

For more information, please pay attention to Daqingpu Fangtan!

Source: Shanghai Land Market, Qingpu District Government Network

Editor: Daqingpu Fang Tan

Past Highlights:

  • Qingpu was absent again
  • G318 (Oriental Luzhou to Caoying Road) standard upgrade
  • Zhaoxiang Town has a lot of drama this year
  • The 2024 Qingpu Public Primary and Secondary School Enrollment Plan was announced

Read on