laitimes

Notice on the traffic control measures around the road during the construction of the grinding tunnel from X131 Hekou to Zixi Highway

author:Jiangxi lead mountain micro news
Notice on the traffic control measures around the road during the construction of the grinding tunnel from X131 Hekou to Zixi Highway

Notice on the traffic control measures around the road during the construction of the grinding tunnel from X131 Hekou to Zixi Highway

The dangerous rock mass at the exit of the grinding tunnel is located at the K2+660-K2+800 place from the X131 estuary to the Zixi Highway, which belongs to the territory of Yangjiaqiao Village, Yongping Town, Leadshan County, the landslide body is treated by the dangerous rock of the road cut, the slope is 140 meters long, the slope is about 80 meters high, and it is a 7-level high slope.

In order to ensure the smooth progress of the dangerous rock mass treatment project at the exit slope of the X131 grinding tunnel in Leadshan County, Shangrao City and road traffic safety, according to Article 39 of the Road Traffic Safety Law of the People's Republic of China, it is decided to take traffic control measures on the roads around the grinding round tunnel from April 12, 2024 to July 11, 2024. The relevant matters are hereby notified as follows:

1. Control time

April 12, 2024 to July 11, 2024

Second, the control of road sections and requirements

From April 12, 2024 to July 11, 2024, the K1+800 to K3+400 section of the X131 Hekou to Zixi (formerly Heyong Expressway) highway will be one-way driving.

3. Bird's eye view

Notice on the traffic control measures around the road during the construction of the grinding tunnel from X131 Hekou to Zixi Highway

4. Other matters

After the implementation of traffic control, please pass by the vehicle consciously abide by the road traffic safety laws and regulations, in strict accordance with the traffic instructions and signs, prohibit vehicles from parking indiscriminately, driving in the wrong direction, and occupy the road or engage in other illegal acts that affect road traffic safety, the traffic management department of the public security organ will be punished strictly in accordance with the law. When the general public passes through the roads in the traffic control area, please choose a reasonable way of travel and adjust the travel route and time in advance. During the control period, the traffic support team may adjust the control measures according to the on-site situation. We apologize for any inconvenience this may cause to traffic control.

Leadshan County Transportation Bureau

Traffic Management Brigade of Leadshan County Public Security Bureau

The People's Government of Yongping Town, Leadshan County

April 10, 2024

Notice on the traffic control measures around the road during the construction of the grinding tunnel from X131 Hekou to Zixi Highway
Notice on the traffic control measures around the road during the construction of the grinding tunnel from X131 Hekou to Zixi Highway

END

Notice on the traffic control measures around the road during the construction of the grinding tunnel from X131 Hekou to Zixi Highway

Editor: Zhang Hongyu

Producer: Zheng Wei

Review: Su Jiafu

Issued by: Huang Yichuan

The official WeChat of the Propaganda Department of the CPC Leadshan County Party Committee

Produced by Leadshan County Rong Media Center

●Legal Counsel of the Leadshan Weixin Official Account Platform: Jiangxi Shengyi (Leadshan) Law Firm ●Contact: Lawyer Wu: 13803593750 Lawyer: Lawyer Wang: 13479337708 ● Address: No. 15, Building 3, Area A, Longting, Xinjiang, Hekou Town, Leadshan County, Shangrao City, Jiangxi Province

Read on