laitimes

Shanghai Petroleum's first integrated charging and replacing demonstration station was put into operation

On December 29, Shanghai Petroleum's first charging and replacement integration demonstration station, located at No. 157 Zhongshan North Road, Shanghai, with 22 fast charging parking spaces and one WEILAI box replacement power station, was put into operation. The newly built station refueling area and charging and replacing area are independently set, with a large site and convenient vehicle access, which can meet the charging needs of 500 new energy vehicles in a single day. On the day of the camp, more than 10 taxis, online ride-hailing cars, etc. came to "taste the new".

Shanghai Petroleum's first integrated charging and replacing demonstration station was put into operation

Mr. Ni, a taxi driver who often drives near Xibaoxing Road on Zhongshan North Road in Shanghai, has finally solved the annoyance of the inconvenience of charging new energy vehicles. Mr. Ni said: "Charging for about 20 minutes, you can easily go on the road for 200 kilometers, charge twice a day, run down, and save nearly 50% compared with the previous refueling."

"There are nearly 600 square meters of site conditions at gas stations in the central city of Shanghai, and there are only a few stations equipped with charging and replacing facilities. The integrated charging and replacing station of this investment fills the gap of public charging and replacement integration facilities such as new energy taxis in Shanghai's Jing'an District, which not only ensures the energy replenishment demand for travel in the taxi urban area of the region, but also provides a demonstration sample for the construction of new energy infrastructure in the central urban area. The relevant person in charge of Sinopec said.

In order to meet the charging needs of regional taxis, online car drivers and some new energy vehicles as soon as possible, to solve the "charging inconvenience" of Mr. Ni's driving troubles, after the completion of power at the end of November this year, Shanghai Petroleum began to prepare for operation, the current charging and replacement integration station is equipped with 6 "one tow four" chargers, the average power of each charging terminal reaches 75KW, which can meet the charging of 22 electric vehicles at the same time. The power exchange facility is a NIO generation box replacement power station, and the average time for a vehicle to change power is only 3 to 5 minutes. The charging method supports scanning code charging, plug and charge, to meet the needs of all national standard electric vehicles. Not only that, because of the comprehensive functions of refueling and convenience stores, as well as the heart-warming projects such as "Love Station" and "Driver's Home", the new gas station is equipped with service-oriented facilities such as vending machines and wireless networks, and for many private car owners who drive hybrid fuel-electric vehicles, they can realize the one-stop experience of charging (changing), refueling, shopping and leisure.

It is understood that Sinopec sales of Shanghai Petroleum to accelerate the deployment of new energy development strategy, the recent new refining gas station will also use photovoltaic power generation facilities, in the charging and replacement, photovoltaic projects and other aspects of the active layout, cultivate new kinetic energy, and vigorously promote the scale of the new energy industry. This year, 30 charging and swapping projects have been completed or operated, and 20 photovoltaic stations have been laid, comprehensively promoting the transformation and development of "oil, gas and hydrogen electric services" integrated energy service providers, and helping to achieve the "double carbon" goal. (Economic Daily reporter Li Zhiguo)

【Source: Economic Daily News Client】

Read on