Meitushi issued a bidding announcement for the installation of equipment in the second phase of the workshop of the Global Ecological Intelligence Headquarters

author:Tu wins the world

On May 10, 2024, Meitushi issued a bidding announcement for the installation of equipment in the second phase of the workshop of the Global Ecological Intelligence Headquarters, which is as follows:

(Important statement: Our bidding procedures and content have the right to adjust according to the actual business situation of the company.) Before the contract is formally signed between the two parties, our company still has the right to choose and reject any or all bidders, and does not give any explanation for the actions taken. Our company does not explain the reasons for the failure of the bidder. Nothing in the tender documents constitutes any commitment or guarantee on the part of our company. The bidding company will be used as an important reference for our company's subsequent bidding project transactions. )

1. Project Overview

1. All times in the bidding invitation and bidding documents of this project are 24-hour Beijing time, all currency units are RMB yuan, and the measurement units used are subject to the "Legal Units of Measurement of the People's Republic of China" (unless otherwise specified).

2. Project No.: MDSX20240510

3. Project Overview: This project is the second phase of the workshop equipment installation project of the Global Ecological Intelligence Headquarters of Meitushi, with a construction area of 80,000 square meters, see the general plan for details.

4. Project address: SD-I-03-02-01-31-01 plot of the second industrial zone of Maicun, Xingtan Town, Shunde District

5. Bidding content:

5.1 Production equipment installation: latex paint, real stone imitation stone paint, colorful paint and waterproof dry mortar production workshop equipment installation, see "Equipment Layout Drawing", "Equipment List", "Process Flow Chart" and other accessories for details

5.5 Strong and weak current wiring, instrument supply and installation See electrical drawings for details.

(Responsible for the installation of equipment in the production workshop, divided into 2# workshop, 2# workshop on the ground floor, building height: 22.4 meters, concrete structure, indoor three to four layers of production platform; They are latex paint, real stone imitation stone paint, colorful paint and waterproof dry mortar production workshop equipment installation projects; Workshop production process, pipeline installation, etc. )

6. Service period: The specific start date is subject to the start order. Complete all construction tasks according to the requirements of the construction period and pass the experience.

2. Qualification requirements for participating companies

1. The applicant must be an independent corporate legal person with a valid business license; Organization code certificate and tax registration certificate (or three-in-one certificate) supporting documents;

2. The establishment period is more than five years;

3. The bidder must have the Grade A qualification for chemical engineering, the professional contracting qualification for building mechanical and electrical installation engineering, and the "Safety Production License" within the validity period;

4. Have the "Special Equipment Installation, Transformation and Maintenance License" within the validity period, as well as the qualification of Grade II and above for professional contracting of mechanical and electrical equipment installation, and the first-class qualification for installation, transformation and maintenance of "Pressure Pipeline";

5. The project manager has the corresponding level of project manager certificate and qualified safety production assessment certificate

6. There are no less than three similar performances, and the single contract amount is not less than 10 million yuan;

7. The enterprise has not been suspended by the relevant departments for bidding qualification and within the suspension period due to fraudulent bidding or serious breach of contract and major project quality problems;

8. Have a good business reputation and a sound financial accounting system;

9. Have the necessary equipment and professional and technical ability to perform the contract, and be able to provide high-quality services;

10. Have a good record of paying taxes and social security funds in accordance with the law;

11. The project does not accept consortium bidding;

12. Experience in the installation of equipment in large-scale domestic coatings and waterproof coating enterprises is preferred.

Third, the steps of the standard

serial number steps Matters Cut-off time (estimated)
1 Application

Qualified bidders shall sort out the information according to the qualification requirements of the supplier and send it to the company's exclusive mailbox [email protected] for bidding in the form of express delivery or email (qualification review).

Address: No. 11, Sanzhou Zhenxing Road, Lunjiao Street, Shunde District, Foshan City

Attn: Ms. Leigh

Contact: 0757-27332201

2024.05.10-05.25
2 Qualification review and inspection If the preliminary examination of the registration materials by the supervision and internal audit department is met, the members of the bidding team will be organized to conduct on-site review, and those who pass the inspection will be included in the final shortlist, and will be notified to pay the bid deposit. 2024.05.25-05.27
3 Pay a bid bond

1. Bid deposit amount: RMB 50,000 (RMB 10,000).

2. Payment form: non-cash form (such as wire transfer, transfer).

Name: Guangdong Meitushi New Material Technology Co., Ltd

纳税人识别号:91440606MAC6YFQ73Y

Address and telephone: No. 1, 2nd Floor, No. 1, No. 13, Qi'an Road, Qixing Community, Xingtan Town, Shunde District, Foshan City, Guangdong Province 0757-27339578

Bank and account number: Guangdong Shunde Rural Commercial Bank Co., Ltd. Lunjiao Sanzhou Branch 801101001351499751

Note: The bidder should write in the "Remarks" column of the payment voucher for inquiry.

Before May 27, 2024
4 Preparation of tender documents Bidding documents include, but are not limited to: a copy of the legal representative's ID card, a legal person's power of attorney, a copy of the client's ID card, a copy of the business license, qualifications, the person in charge of the project, the bidding quotation, a copy of the deposit voucher and other signatures and seals, at the same time, in strict accordance with the format requirements of our company, together with the electronic version of the quotation copy of the U disk in the document bag sealed and sealed, on-site supervision. 2024.05.25-05.29
5 Tender document requirements

1. The secondary list indicates the total price of the quantity, unit price,

2. The brand and model of important parts are indicated,

3. Important materials indicate key information such as material, thickness, brand, etc.,

2024.05.25-05.29
6 Bid opening, bid evaluation, bid awarding The bid evaluation team determines the winning supplier based on the principles of openness, fairness, justice, merit and efficiency. 2024.06.03
7 Issue a notice of winning the bid The bid evaluation committee sends the notice of winning the bid and a letter of thanks. 2024.06.05
8 contract Contract negotiation and signing 2024.06.06

Four. Contact

Purchasing unit: Guangdong Meitushi New Material Technology Co., Ltd

Address:

Contact:

Phone:

Location

Five. How to make a complaint

Contact Department: Meitushi Supervision and Internal Audit Department

Phone: 0757-27339085

E-mail: [email protected]

(The reporting hotline is only used for integrity complaints, if you have any business inquiries, please contact the contact person in Article 4 above)

Publisher: Guangdong Meitushi New Material Technology Co., Ltd

Published: 2023-05-10

Meitushi issued a bidding announcement for the installation of equipment in the second phase of the workshop of the Global Ecological Intelligence Headquarters

Read on