laitimes

The municipal engineering project of Fuxing Avenue in Fengdong New Town was officially opened to traffic

author:Xixian New Area

On May 18, the municipal engineering project of Fuxing Avenue in Fengdong New Town was officially opened to traffic.

Fuxing Avenue Municipal Engineering Project is the main road connecting the north-south traffic of Fengdong New Town in Xixian New District, with a total length of 3.5 kilometers and 8 lanes in both directions, with a single road width of 30 meters and a central green corridor of 70 meters wide, including the central green corridor and underground space.

Fuxing Avenue is an important artery connecting the "leading axis of scientific and technological innovation" in Greater Xi'an, connecting Metro Line 1 to the north, Metro Line 16 in the middle, and Metro Line 5 to the south.

The municipal engineering project of Fuxing Avenue in Fengdong New Town was officially opened to traffic

After the official opening to traffic, it will further open up the internal and external circulation of Fengdong New Town, form an efficient and convenient three-dimensional traffic pattern, comprehensively improve the connectivity capacity of important node projects such as Xi'an International Football Center, Intelligent Sensing Industry Base of Automatic Control Institute, Xi'an West Railway Station, and Collaborative Innovation Port, and strongly support the development of regional headquarters economy and emerging industry agglomeration, which will play an important role in optimizing the urban spatial layout and strengthening internal and external communication.

What are the key projects along Fuxing Avenue, let's take a look:

Xi'an International Football Center

The municipal engineering project of Fuxing Avenue in Fengdong New Town was officially opened to traffic

The project covers an area of 280 acres, with a total construction area of 251,000 square meters, including a 60,000-seat professional football stadium and supporting facilities, which can host all international top football events including the World Cup.

Intelligent Sensing Industrial Base of the Institute of Automatic Control

The intelligent sensor industry base of the automatic control institute is located in the west of Xizhou Avenue and the north of Wenxuan 4th Road, covering an area of 60 acres, with a total construction area of 117,800 square meters, a total investment of 1.21 billion yuan, and 7 buildings are planned to be constructed. Focusing on the development layout of "1 center + 1 base", the project will build the only and domestic first-class MEMS R&D process platform in the aviation industry system, and build a R&D and industrialization base for aviation intelligent sensing products.

The municipal engineering project of Fuxing Avenue in Fengdong New Town was officially opened to traffic

After the completion of the project, it will focus on the R&D and production of fiber optic gyroscopes and microsystems in the field of inertial sensing, with an estimated cumulative output value of more than 8 billion yuan in five years, the introduction of more than 500 high-tech talents, and the comprehensive acceleration of the gathering of regional intelligent perception enterprises, the creation of intelligent perception industry chain clusters, and the strong drive to the coordinated development of relevant industrial chain supporting enterprises in the region. Up to now, the main structure of the project (phase I) has been capped and is expected to be completed and delivered by the end of this year.

Xi'an West Railway Station

The municipal engineering project of Fuxing Avenue in Fengdong New Town was officially opened to traffic

Xi'an West Railway Station is the first station of the Xicheng Passenger Train from Xi'an North Railway Station, and the station was put into operation on December 6, 2017. The smooth connection between Fuxing Avenue and Xi'an West Railway Station will comprehensively promote the coordinated development of regional commerce, logistics and tourism while improving the layout of the transportation network, and inject new vitality into regional economic development.

Collaborative Innovation Port

The municipal engineering project of Fuxing Avenue in Fengdong New Town was officially opened to traffic

The Collaborative Innovation Port is located north of Wangsi West Street, south of Fengdong Avenue, west of Fuxing Avenue and east of Keyuan 4th Road, with a total area of about 168 acres, and has successively introduced key enterprises such as CSSC Pan-China, Berry Gene, Baimei Gene, China Academy of Information and Communications Technology, and iSoftStone. Up to now, there are nearly 200 enterprises in the Collaborative Innovation Port, attracting more than 6,000 talents of all kinds.

OCT Creative Center

The municipal engineering project of Fuxing Avenue in Fengdong New Town was officially opened to traffic

Located at the southern end of Fuxing Avenue, OCT Creative Center covers an area of 80.2 acres and has a planned total construction area of about 226,000 square meters, covering Grade A office buildings, boutique hotels, new retail businesses and other diversified business formats, creating a commercial complex integrating business, office, leisure and other functions. Up to now, buildings 1, 2, 3, 4, 6 and 7 of the project have been completed; The main body of Building 5 was constructed to the third floor.

U PARK ABP

The municipal engineering project of Fuxing Avenue in Fengdong New Town was officially opened to traffic

U PARK ABP is located in the south of Kunming 1st Road, north of Kunming 2nd Road and east of Fuxing Avenue, with a planned total construction area of about 210,000 square meters, including a super high-rise Grade A office building, two high-rise Grade A office buildings, two LOFT buildings and three single-family garden office buildings. At present, the main construction of the north area of the project has been completed, and the pipeline installation and façade curtain wall construction are underway; The construction of Building 7 in the South District has been completed, and the raft construction of Building 8 is underway.

Read on