laitimes

The ecological restoration of the Xingren area and the water supply project of the irrigation area undertaken by the Ningbo Industry Bureau passed the acceptance of the lower gate water storage

author:The economy is big

On May 16, the Shapotou District Water Affairs Bureau organized relevant departments to carry out the acceptance of the red circle reservoir of the ecological restoration and irrigation area (phase I) water supply project in the Xiangshan Xingren area undertaken by Ningxia Water Conservancy and Hydropower Engineering Bureau Co., Ltd. Shapotou District Water Affairs Bureau, Development and Reform Bureau, Finance Bureau, Agriculture and Rural Bureau, Quality Supervision Station, Xiangshan Township Government, external experts, Zhongwei Water Company, safety appraisal institutions and relevant personnel of each participant of the project participated in the acceptance.

The ecological restoration of the Xingren area and the water supply project of the irrigation area undertaken by the Ningbo Industry Bureau passed the acceptance of the lower gate water storage
The ecological restoration of the Xingren area and the water supply project of the irrigation area undertaken by the Ningbo Industry Bureau passed the acceptance of the lower gate water storage
The ecological restoration of the Xingren area and the water supply project of the irrigation area undertaken by the Ningbo Industry Bureau passed the acceptance of the lower gate water storage

The successful completion of the acceptance of the lower gate water storage marks the major achievements of the ecological restoration and irrigation area (phase I) water supply project in Shapotou District, and lays a solid foundation for the "water security" for production, living and farmland irrigation water in Xingren District, Xiangshan.

Source: Ningxia Water Conservancy and Hydropower Engineering Bureau Co., Ltd

Read on