Mechanical and electrical installation creates "Luban Award" project planning and process management

author:Wentong Nansha

Mechanical and electrical installation engineering should first ensure the use of the function and safety performance of each profession, where in violation of the mandatory provisions or there are serious safety hazards, the quality of the project is common, are not able to pass the evaluation of the excellent project.

Key parts of installation project planning and implementation monitoring:

Layout planning of the upper space of the lower garage and underground public walkway;

Functional rooms; Toilet; electric wells, tube wells;

installation of roofing equipment, roofing pipes, and lightning protection nets;

Ceiling; fireproof treatment of wood decoration, soft decoration and socket switch;

construction of the bridge; motor inlet processing; Pipe root, support and hanger root treatment; Outdoor grounding test point setting; installation and construction of distribution cabinets and distribution boxes;

application of plumbing, equipment, paint color and identification; Toilet checkpoints, floors and related facilities are handled.

Layout of the upper space of the underground garage and underground public walkway:

In the basement, including the underground garage and the upper space of the public walkway, it is routinely covered with various water, electricity, heating, gas, ventilation, and air conditioning pipes. These pipes are criss-crossed, and most of them are as high as 7~8 layers. Whether the layout is reasonable and beautiful, the secondary deployment should be carefully carried out in the planning of excellence, and the installation and construction should be carried out carefully.

Mechanical and electrical installation creates "Luban Award" project planning and process management

Water, heating, electricity pipelines criss-cross, orderly arrangement.

Functional rooms:

Various computer rooms, such as air conditioners, pump rooms, boiler rooms, power distribution rooms, intelligent control rooms, etc., are the parts that can best reflect the level of technology.

Whether the layout of various pipelines and equipment is reasonable and orderly, and whether the installation process level is fine, will directly affect the operation, normal function and visual effect of the equipment. The safety and rationality of a variety of support and hanger settings and process pipelines should be considered first, and the use function should not be affected for the sake of aesthetics.

It is necessary to consider the elevation orientation of the equipment and the pipeline layout to cooperate with each other, which not only meets the functional requirements, but also meets the aesthetic requirements. The color and logo of various paints, insulation layers, and coatings will also have a great impact on the visual effect, so it is necessary to carefully plan and construct.

Mechanical and electrical installation creates "Luban Award" project planning and process management
Mechanical and electrical installation creates "Luban Award" project planning and process management

The equipment and pipelines of the air-conditioning and refrigeration room are arranged in a neat and orderly manner, and the pipes share a hanger, which is beautifully arranged.

Mechanical and electrical installation creates "Luban Award" project planning and process management
Mechanical and electrical installation creates "Luban Award" project planning and process management

The equipment pipeline insulation workmanship is fine, the layout is exquisite, and the height of decoration and installation is uniform, and the paint color complements each other; The equipment of the pump room is arranged in an orderly and standardized manner, and the paint color is bright and bright, and the layout is neat and bright.

Mechanical and electrical installation creates "Luban Award" project planning and process management
Mechanical and electrical installation creates "Luban Award" project planning and process management

The equipment layout of the distribution room is standardized and orderly, neatly arranged, and the height of the installation is unified, clean and bright.

Roof layout: pipes, equipment, lightning protection systems

The roof is a must-inspect place, and many roofs are equipped with equipment such as smoke exhaust and cooling water towers, as well as pipelines, lightning protection, landscape lighting fixtures, etc. In order to consider the beauty of the roof and the perfect function, it is necessary to design twice and have a comprehensive layout. Closely cooperate with civil engineering and roof decoration, unify planning, consider the function of the installation project to further improve the installation project, and also play a good role in the protection of the finished product. You can consider intentionally creating some highlights and making some humanized sketches to play the role of the finishing touch.

Mechanical and electrical installation creates "Luban Award" project planning and process management
Mechanical and electrical installation creates "Luban Award" project planning and process management

The secondary design of roofing pipes, equipment, and lightning protection systems, comprehensive layout, close cooperation with civil engineering, unified planning, and manufacturing highlights, play the role of the finishing touch. The roof lightning protection facilities are bent with the shape of the building, the gusset on the parapet wall is pressed to the top and the stainless steel lightning protection railing, the height and the roof exhaust pipe are fixed to meet the requirements of the specification, and the steel ladder is provided across the partition parapet wall to facilitate maintenance and inspection.

Mechanical and electrical installation creates "Luban Award" project planning and process management
Mechanical and electrical installation creates "Luban Award" project planning and process management

Installation of electric wells and tube wells:

Each layer of electric wells, tube wells are the object of re-inspection during spot checks, in addition to the civil construction should be in place according to its provisions, (construction sequence: the top of the well→ the wall→ installation → ground). The layout and construction of the installation project is also particularly important. Bridges, cables, distribution boxes, busbars, lamps, pipelines, and valves should be arranged in a neat and orderly manner. Planning should be carried out before construction. According to the size of the space of each shaft, the construction drawing is formed reasonably. The unified installation process of each layer is safe and reliable, the process is perfect, and the beauty is durable.

Mechanical and electrical installation creates "Luban Award" project planning and process management

The equipotential grounding is good, the equipment pipeline is well protected at the ground, the fireproof plugging is good, the bus is well installed, the fireproof plugging is tight, and the installation layout is reasonable and vertical;

Mechanical and electrical installation creates "Luban Award" project planning and process management
Mechanical and electrical installation creates "Luban Award" project planning and process management

The bus is well installed and the fireproof plugging is tight; The installation layout is reasonable and vertical.

Toilet Installation:

Toilet utensils, squatting, seated toilets, urinals, switches, sockets, washbasins, floor drains, mop pools, etc., must be closely coordinated with the decoration and jointly planned.

The arrangement of floor tiles and wall tiles is considered together with the installation elevation of the appliances to form a common planning drawing, and then they are constructed according to the determined elevation orientation in order to achieve a beautiful effect.

Mechanical and electrical installation creates "Luban Award" project planning and process management

The installation of the basin sewer pipe is closely coordinated with the decoration and regular, just in the right ground tile joint, the sanitary ware is installed firmly, the elevation is accurate and the decoration is coordinated;

Mechanical and electrical installation creates "Luban Award" project planning and process management

Bathroom walls, floor tiles and partition treatment, wall tiles vertical and horizontal through the switch box in the center of symmetrical installation.

Mechanical and electrical installation creates "Luban Award" project planning and process management

Ceiling installation and construction:

The installation of the ceiling is a must check the link of the Luban Award, the end of the pipeline above the ceiling, in addition to the basement layout requirements, neat and orderly, the bracket is set reasonably, the end of the appliance and the ceiling decoration is a very critical process. When installing pipelines, it is necessary to take into account the places where electrical appliances such as lamps, sprinklers, smoke temperature sensors, horns, cameras, etc., come out, so that when making the ceiling, they can be aligned in the center and do not damage the ceiling keel. Some lamps and lanterns must also be hung to be safe and reliable.

Mechanical and electrical installation creates "Luban Award" project planning and process management
Mechanical and electrical installation creates "Luban Award" project planning and process management
Mechanical and electrical installation creates "Luban Award" project planning and process management

Wood decoration, soft decoration, socket, switch fire treatment: switch, socket box must be flat decorative surface, pipeline must be in place, can not be exposed in the decorative layer, the knot wire must be tight and tin-shabu, insulation and wrapping two layers, the box is best protected with asbestos fireproof board.

Mechanical and electrical installation creates "Luban Award" project planning and process management

Bridge installation and construction:

Mechanical and electrical installation creates "Luban Award" project planning and process management

The angle bending of the bridge joint is standardized, the grounding is good, the arrangement is neat, the paint is perfect, and the tee is correct;

Mechanical and electrical installation creates "Luban Award" project planning and process management
Mechanical and electrical installation creates "Luban Award" project planning and process management
Mechanical and electrical installation creates "Luban Award" project planning and process management

The arrangement of the bridge is reasonable, vertical, installed in place, good fireproof blocking, and clear identification;

Motor inlet:

The lock mouth of the electric pipe to the motor inlet and the metal hose at both ends must be complete and firm, and the process must be perfect;

The metal hose is well grounded, the wiring in the motor is complete, the grounding wire is clear, and the anchor bolts, junction box cover bolts, and heat dissipation hood bolts outside the motor cannot be used as grounding fasteners.

Mechanical and electrical installation creates "Luban Award" project planning and process management
Mechanical and electrical installation creates "Luban Award" project planning and process management

Roof lightning net installation:

Basic requirements: the roof lightning protection net is horizontal and vertical, the spacing of support points is consistent and reasonable, and meets the requirements of the specification;

Expert suggestion: the support point and the lightning net do not use the welding method, use a slightly larger casing than the galvanized garden steel to make the fixture, galvanized and installed on the daughter wall, first, let the galvanized garden steel pass through it to reduce the solder joints, protect the galvanized layer, and increase the service life. Second, the lightning protection net can be freely expanded;

The corner arc of the lightning protection net is smooth and smooth, and the expansion joint should be compensated with a device.

Mechanical and electrical installation creates "Luban Award" project planning and process management
Mechanical and electrical installation creates "Luban Award" project planning and process management
Mechanical and electrical installation creates "Luban Award" project planning and process management

Root treatment of pipe root and support hanger:

All pipelines, can be fixed with a boom, do not use a bracket, the boom on the beam plate rooting, it is best to use implosion bolts, and then add a decorative cover, through the beam through the plate, add a material decorative ring, landing pipe, floor bracket, the root made of cement table, not only to protect the root from rust, but also to play an aesthetic role.

Mechanical and electrical installation creates "Luban Award" project planning and process management
Mechanical and electrical installation creates "Luban Award" project planning and process management
Mechanical and electrical installation creates "Luban Award" project planning and process management
Mechanical and electrical installation creates "Luban Award" project planning and process management
Mechanical and electrical installation creates "Luban Award" project planning and process management
Mechanical and electrical installation creates "Luban Award" project planning and process management
Mechanical and electrical installation creates "Luban Award" project planning and process management

Outdoor Grounding Test Point Setting:

Outdoor grounding test points should be set up according to the design and specification requirements, and the setting should not be hasty, first, should not highlight too many buildings, second, the test should be convenient, third, it should be integrated with the exterior wall, beautiful and bright, and fourth, it should be clearly marked. A good setup can also be the icing on the cake.

Mechanical and electrical installation creates "Luban Award" project planning and process management

Handling of distribution cabinets and distribution boxes:

In addition to the installation of independent distribution cabinets, distribution boxes and rows of distribution cabinets, in addition to meeting the requirements of the specification, verticality, horizontality and elevation, the process in the cabinet and box should be treated as follows:

1) The electric pipe in the box should be arranged neatly with one pipe into one hole, fixed with a lock nut, and the nozzle should be treated with perfect mouth protection;

2) The inner line and the zero line in the box should be connected by the busbar, and there should be no more than two wires on each bolt, and the color separation of the line should meet the requirements of the specification;

3) The cable should be listed, indicating where it comes from and where it is going;

4) The wiring is neat, the fixation is firm, the process is beautiful, and the box is clean and free of debris;

5) The door with electrical components should be grounded, the board surface should be clearly marked, clean and bright, the board surface should be smooth, and the paint should be complete;

6) The cable introduction of the distribution cabinet should be sealed for fire prevention.

Mechanical and electrical installation creates "Luban Award" project planning and process management
Mechanical and electrical installation creates "Luban Award" project planning and process management

Plumbing, equipment, paint color and identification:

In the specification, there are requirements for paint color for various pipelines. Such as: fire sprinkler pipe, red, fire alarm pipeline, white fireproof coating, in the basement, computer room and other places where the pipeline is concentrated, how to strengthen the pipeline, and weaken the support hanger, is a problem worth studying, some pipelines that do not have strict requirements for color, how to configure the color, will play a great role in the perception, the color is used well, it will make people have a dazzling feeling, and strengthen the color of the pipeline, weaken the color of the bracket, so that people still focus on the pipeline, highlight the beauty of the pipeline. will receive good results. In addition, all kinds of pipeline identification, text and flow arrows, size, color, and location of the pipeline will play an embellishment role.

Mechanical and electrical installation creates "Luban Award" project planning and process management
Mechanical and electrical installation creates "Luban Award" project planning and process management

The common pipe rack logo and professional color logo are clear, the colors are bright, and the logo is eye-catching and bright.

Main quality features: the mechanical and electrical system is finely planned, the layout is beautiful and reasonable, and the operation is reliable.

Key Quality Highlights:

The large-space equipment room is reasonably arranged after deepening the design, the details such as pier base and drainage ditch are exquisitely handled, the pipelines are arranged in rows, and the identification is clear.

Mechanical and electrical installation creates "Luban Award" project planning and process management

The details of the pier base and drainage ditch used for the equipment are unified and exquisite.

Mechanical and electrical installation creates "Luban Award" project planning and process management

This article comes from the Internet, compiled and edited by HVAC South Press.