laitimes

See you again" Cao Yang a village

author:Take a look at the news

Look at the news of The Knews reporter Should Guanwen

2021-10-29 20:44

Today, the relocation ceremony of Caoyang Yicun Ergong District was officially launched. As the first pilot renovation of the entire village, the second engineering area is composed of a total of 369 households and 12 natural buildings. At present, more than 90% of the renovation has been completed, and nearly 20% of the residents have moved back in. This was once the first workers' village in New China, and after 70 years of construction, it has been rejuvenated. From the start of the consultation, to the current official move back in, less than two years, what are the stories behind the acceleration of the old change in Caoyang Village?

"You guys are here, welcome! Haven't seen it in a lot of times! ”

See you again" Cao Yang a village

After nearly four months, when the News News reporter saw Zhang Linqing and his wife again, they were sorting out their new home. Coal guard used exclusively, clean and bright, looked forward to most of his life, and finally got his wish.

Mr. Zhang Linqing pointed to the new bathroom after the complete set of reconstruction, and smiled happily: "This we specially proposed, the toilet position was changed, one household and one plan, the designer also agreed." The original toilet shower room added up to only 0.7 square meters, like now the structure has been changed, and it is convenient to engage in hygiene. ”

See you again" Cao Yang a village

The kitchen that was once shared by three families has completely become the past, and after that, it will be a single family, cooking rice and stir-frying, refreshing and refreshing.

Aunt Zhao recalled to the News News reporter: "Sometimes hand to hand, and neighbors to meet, the old kitchen is not clear, because there are three families, to get together." But then I found out that the house was too old to be cleaned. ”

Moving back is an old house and a new home. Zhang Laobo, who had a heart, reframed the calligraphy and paintings, and Aunt Zhao newly hooked a blanket and a bedspread. Without waiting for the large troops, Mr. Lu and His Wife Qi aunt in the building next door also moved in in advance.

See you again" Cao Yang a village

"You see, now Auntie stir-frys a dish, and there is a de-exhaust hood!"

Coarse tea and light rice, the old two mouths are full of joy. Five square kitchens, about three square bathrooms, a few clean windows, pull down the retractable staircase, up to the three-story attic. This small loft, in addition to storage, can also put down a bed.

Aunt Qi sighed at the change while eating dinner: "The most obvious feeling is the escalator." The old escalator came up, straight, creaky, very shaky and dangerous, and he was going to wrestle when he was not careful, and the old man had fallen several times, and once he walked in a hurry, slid down, and his ribs were broken. Mr. Lu smiled and nodded: "The outside is refreshing, the home is also refreshing, the garbage used to be crowded together, now it is renovated, more empty and clean." ”

See you again" Cao Yang a village

The small home has been renewed, and the large community has also turned gorgeous. The original chaotic pipelines are now all on the ground, after 70 years of wind and rain, the old steep wooden staircase has more corner design, paved with flat floor tiles, the previous dirty and messy green belt has also been renovated, and there is a small central garden for rest.

Residents either exercise in the garden, nag at home, or take a chair out to bask in the sun, and look up at the clean skyline: "The whole community environment is also better, the spider web is gone, the previous bundles of wires, pulling and pulling." Now they say that all six kinds of pipelines have landed, and even the piles have been pulled out, which looks refreshing. ”

The six kinds of pipelines are concentrated, in fact, it is still a small part of the transformation. The overall reconstruction of Caoyang Village can be called an unprecedented challenge for the extreme of old reform. Caoyang Village, which was completed 70 years ago, was built using cinder cement bricks and wooden grilles, and the quality of the houses was poor. Therefore, the problem of old reform is particularly prominent here. This renovation not only solves the long-awaited problem of exclusive use of coal guards, but also strengthens the safety of the house as a whole. More importantly, as an excellent historical style protection area in Shanghai, the houses must be changed, but the original style and texture cannot be destroyed.

See you again" Cao Yang a village

Chen Zhongwei, chief engineer of Shanghai Architectural Decoration Group Design Co., Ltd., introduced: "In the past, the prefabricated board was only a little more than 9 centimeters, and it could be heard when walking, not to mention safety. Therefore, this time we did the seismic resistance, circle beams, the original wooden grille of this kind of place are changed to cast-in-place concrete, the roof we also have to use insulation materials. But in this way, the project becomes difficult to do, because the material reinforcement is thickened, but the area inside the set is also guaranteed. Our residents are quite sensitive to the size of this place, because this is the place where they have been for decades, and the old furniture cannot be put in, and the eyes can see it at a glance. So, don't say a square, even if it is less than 0.1 square, it will come to you. ”

As the second work area of Caoyang Village, which was the first to pilot the complete set of transformations, it took less than two years from consultation to relocation. As the residents move back one after another, the designer also has a new task list, in the process of home inspection, the residents have something to improve, the designer records one by one. Designer Jin Xiaoming said that unlike all the houses on the market, here because of the one-household-one-plan, the construction party is quite challenging, can not draw the gourd, and for them, each inspection should also spend more time, as soon as there is something wrong, it must be modified in time. "Oh, like this Huang resident's home, here the flat top to do a height difference" Designer Jin Xiaoming took the drawings to compare one by one, "the elevation is different, one is 1800, and there is 1570, here I want to measure it again." ”

See you again" Cao Yang a village

Now, residents are living in one after another, and the work cannot be stopped. "There will be a post-evaluation, the entire work and the project of architectural evaluation, is not to achieve the expected design effect, is not to meet the needs of the people, which is also the biggest embodiment of respect for public opinion in construction and design."

For a super-large city like Shanghai, the future of large-scale demolition and construction will be less and less, how to meet the needs of urban renewal and old reform, Caoyang Village as a pilot project in the city, providing a new reference path.

See you again" Cao Yang a village

Chen Zhongwei, chief engineer of Shanghai Architectural Decoration Group Design Co., Ltd., said in an interview: "On the road of old reform, we must break through the existing government regulations. If we want to take Caoyang Village to do replication and promotion, it is not practical, because not all old renovation projects can add area, but this way of emancipating the mind can be explored. At present, our current norms, may not have a suitable legal norms for our urban renewal, the lack of relevant supporting facilities, so Caoyang Village, or Huangpu's old reform, are done as a pilot, we and the government together feel the stones to cross the river, hoping to explore a feasible road. ”

See you again" Cao Yang a village

Similarly, territorial governments have also learned from this and formed a more efficient method of "old reform work". Xu Chunhui, secretary of the Party Working Committee of Caoyang Xincun Subdistrict, recalled: "When a village did the pipeline landing, there was a realistic contradiction, there was only one main road in the Ergong District, but it was an integrated operation, the materials could not not go in, the road was open and broken, and the car could not go in. Later, together with several departments, we opened a new road next to it without affecting the residents as much as possible, and we could send materials into it, and the road was coordinated in many aspects, including greenery. On the one hand, we will do all the engineering projects to be regular, minimize the impact, and save the construction period. In addition, after all, the original department has the corresponding professional field, but in the face of the same people's livelihood project, we need to break through the original barriers and take a step forward, which is our work experience and the harvest that is given through the people's livelihood project. ”

Over the past 70 years, Caoyang New Village has become a name that carries countless memories and glory. Today, it has been reborn and remodeled to provide a new sample for urban renewal. After the perfect completion of the complete set of transformation of the second industrial area of Caoyang Village, the first industrial area will also usher in the delivery and relocation in the middle of next month, and the third and fourth industrial areas will strive to complete and deliver within this year. The old Cao Yang is looking forward to writing the "new village" love for 70 years in the old house that has been revitalized.

(Look at the news Knows reporter: Ying Guanwen Camera: Kong Quan Jiang Wenyue Intern Editor: Yang Shijie)

See you again" Cao Yang a village
See you again" Cao Yang a village
See you again" Cao Yang a village

Read on