laitimes

In the spring ploughing season, CCCC construction project nodes continue to be new

author:CREC China Railway Zhang Xin

In 2024, CCCC construction builders

Make a concerted effort for development

Stride forward to start a new game

recently

A number of key projects of the company

Go all out to grasp production and promote performance

Strive to sprint to the second quarter!

Cambodia Highway 41 B bid project AC-13 asphalt surface course test section paved completed

In the spring ploughing season, CCCC construction project nodes continue to be new

Recently, the asphalt surface test section of Cambodia Highway 41 B project undertaken by Xiongan Company has been paved.

The project is located in Damnak Ampil District, Kampong Speu Province, with a total length of 95.269 kilometers intersecting with Cambodia Highway 4 and ending at Cambodia Highway 3. Among them, Lot B has a total length of 50.269 kilometers and adopts the two-lane secondary highway standard for split-way driving, with a design speed of 60 km/h.

After the completion of the project, it will accelerate the economic and social development of Cambodia and play a good role in improving the living standards of the people along the route.

The pile foundation of the Green Ridge Bridge of the 2nd bid project of Baima Airport Road has been completed

In the spring ploughing season, CCCC construction project nodes continue to be new

Recently, the pile foundation of the Green Ridge Bridge of the Baima Airport Road 2 project undertaken by Southwest Company has been completed.

The project is located in Tiandong County and Tianyang District, Baise City, Guangxi Zhuang Autonomous Region, with a total length of 15.694 kilometers, including roadbed, pavement, bridges, tunnels, greening, housing construction and other projects along the line. Among them, the Green Ridge Bridge is located in the integral roadbed, with a maximum bridge height of 47.7 meters, a bridge net width of 2×11.75 meters, and a bridge length of 349 meters.

After the completion of the project, it will improve the transportation service capacity of the old revolutionary base area of Zuojiang and promote the development of local tourism.

Linying County Intelligent Equipment Industrial Base Project (Phase II)

The foundation grooves of buildings 12, 13, 17, 18 and 22 passed the acceptance

In the spring ploughing season, CCCC construction project nodes continue to be new

Recently, the foundation groove of No. 12, 13, 17, 18 and 22 buildings of Linying County Intelligent Equipment Industrial Base Project (Phase II) undertaken by Liujian Company passed the acceptance.

The project is located in Wadian Town, Linying County, Luohe City, Henan Province, with a total construction area of about 263,900 square meters. The construction content includes factory buildings, office buildings, underground buildings and supporting facilities.

After the completion of the project, it is of great significance to promote the industrialization transformation and development of Linying County and promote the full realization of the rural revitalization strategy.

Source: CCCC Construction

Xiong'an Company | Liujian Company | Southwest Company

Read on