laitimes

SAIC Motor will launch a stress test on April 18 to gradually promote the resumption of work and production

Recently, the pictures exposed on the Internet show that Wang Xiaoqiu, director, president and deputy secretary of the party committee of SAIC Motor Group Co., Ltd., issued a notice entitled "Notice on Issuing guidelines for the prevention and control of the epidemic caused by SAIC Motor Group Co., Ltd. to resume work and production".

SAIC Motor will launch a stress test on April 18 to gradually promote the resumption of work and production

According to the documents, at present, SAIC's production enterprises have conducted a survey of the preparation for the resumption of work and production, and the results of the survey were fed back to the Group's Quality and Economic Department before April 17 (Sunday), and the production enterprises began to start the stress test of resuming work and production on April 18 according to the situation. Once the stress test is successful, the company will arrange the production of vehicles and parts as soon as possible.

SAIC Motor will launch a stress test on April 18 to gradually promote the resumption of work and production

Before the shanghai municipality was fully unsealed, SAIC motor had already declared that it had entered the "white list" of enterprises that had started to resume work and production in advance. When the company and the factory independent area of the resumption of work and production, the abnormal and infected personnel are fully cleared, and the conditions for no new positive cases are met for 7 consecutive days, the resumption of work can be started. After entering the factory, employees immediately undergo a 3-day silent period of management (separate management from the original resident personnel), during which the daily nucleic acid or antigen test is negative before returning to work.

At the supply chain level, SAIC motor will cooperate with partners to promote the gradual resumption of work and production. In the document, SAIC motor will put forward the need to resume work to suppliers in advance, and timely map out the ability of supporting suppliers at all levels to resume work.

Read on