laitimes

This new bridge over Suzhou Creek is not ordinary! It is scheduled to be completed within this year, and people can take a leisurely stroll on the bridge deck

author:Thoughtful client

A new "slow-moving bridge" for pedestrians and non-motorized vehicles will be added to the Suzhou Creek. Its design is light and beautiful, and some people call it a "high-value pedestrian bridge". It is the Anyuan Road Bridge under construction. According to the Municipal Transportation Commission, the Anyuan Road Bridge will be completed and opened to traffic in 2022, which will provide a suitable public space for the public.

This new bridge over Suzhou Creek is not ordinary! It is scheduled to be completed within this year, and people can take a leisurely stroll on the bridge deck

Renderings of Anyuan Road crossing the Suzhou Creek Bridge

The full name of this project is "Anyuan Road Across suzhou river bridge new construction project", with a total length of 252 meters, which is a pedestrian landscape bridge and takes into account the implementation of non-motorized vehicles. "We combine the support structure and the cable structure, and the bridge body forms a very distinctive C-shaped shape, and its bridge body floats over the Suzhou Creek, forming a link between the two banks and creating a unique landscape over the Suzhou Creek." The builder said.

While using ingenious design to create a pedestrian space connecting the two banks of the Suzhou Creek, the builders will also create a bridge deck space that can stay, allowing citizens to move more leisurely in the public space.

The main bridge will realize a crossing of the river, and there will be no piers in the water. There are 24 meters of long ramps on each side of the main bridge, and the riverfront is equipped with green belts. On the east and west sides of the bridge, a ladder is set up to facilitate the public to walk on the bridge. The slope of the bridge is gentle, the height difference transition is natural, it is convenient for walking, and non-motorized vehicles can be implemented.

This new bridge over Suzhou Creek is not ordinary! It is scheduled to be completed within this year, and people can take a leisurely stroll on the bridge deck

Although it is a pedestrian-based bridge, its construction significance is extraordinary. This project is a supporting project of "one river and one river" in Shanghai, and the bridge spans the Jing'an and Putuo districts. The entire project starts from the intersection of Anyuan Road and West Suzhou Road in the west, crosses the Suzhou Creek in the east, and connects with the intersection of Chang'an West Road and Guangfu Road. The project plays an important role in the realization of the goal of "one river and one river" slow space networking in the central section of Suzhou Creek.

After the completion of the bridge, it will further improve the traffic conditions of pedestrians and non-motorized vehicles in the area, improve the layout of the bridge across the Suzhou Creek in the area, promote the land development of the surrounding area and drive the economic development of the city.

According to the builders, the Anyuan Road Bridge Project adopts the construction method of "first beam and then arch, supplement the bridge deck", with 3 groups of temporary brackets in the river, and the main girder and main arch adopt the construction method of engineering prefabrication and sectional assembly on both sides of the strait. The staff introduced: "The main beam of the project has a large span, the weight of the hoisting section is large, and the construction is located above the waterway in the central urban area, involving high-altitude and cross-river construction, and during the construction period, it is necessary to ensure the normal and effective navigation width of the Suzhou Creek, and we coordinate with the relevant units to ensure the smooth implementation of the construction." ”

This new bridge over Suzhou Creek is not ordinary! It is scheduled to be completed within this year, and people can take a leisurely stroll on the bridge deck

The engineering project department has formulated a detailed safety protection plan to do a good job in high-altitude and wading construction safety protection; and closely coordinates with the senior management department, traffic police department, and maritime department to do a good job in construction guarantee; and adopts BIM technology for bridge component quality control, strictly controls the quality control from the beginning of factory processing, and ensures the installation accuracy of on-site components.

It is also worth mentioning that the workers have implemented measures such as controlling noise, controlling dust, and maintaining traffic, listening to the voices of surrounding residents, carrying out joint construction and co-construction with local streets and police stations, doing a good job of communication and appeasement, promoting the smooth progress of the project, and ensuring the realization of the construction period goals.

Source: Thoughtful Shanghai

Read on