laitimes

Flower shores, piers, trails... After the renovation of this place "step by step"

author:Purple Cow News

Yangzi Evening News Network January 19 news (correspondent Han Xue reporter Liu Liyuan) the road is flat and clean, the riverside grass is in the green, and now, after the transformation of Nanjing Jiangbei New Area, Puwu Road, Pearl River, Zhuxi River have a new look, everywhere scenery, step by step "meticulous".

Flower shores, piers, trails... After the renovation of this place "step by step"

Puwu Road Slow Walk

Puwu Road runs from Pearl Street in the north to Huqiao Road in the south. The renovation project mainly includes road engineering, drainage engineering, bridge and culvert engineering, Zhuxi River Pearl River flood control project, water environment improvement project, landscape greening project, etc. After completion, this road will not only greatly increase its "appearance", but also further improve the road network of the central business district and improve the traffic and travel conditions. At present, the construction projects of Puwu Road, Pearl River and Zhuxi River have been basically completed, and Puwu Road has been temporarily opened to traffic.

Flower shores, piers, trails... After the renovation of this place "step by step"

Pearl River - Zhuxi River

Pearl River - Zhuxi River is located in the core area of Jiangbei New Area, on the east side of Puwu Road, after confluence through the Qili River into the Yangtze River, the length of the whole river is nearly 5 kilometers, is a whole line parallel to the Old Mountain, and located between the mountains and forests and rivers outside the river, the landscape ecological resources endowment is good.

The Pearl River-Zhuxi River waterfront landscape improvement project includes the construction of the wharf, the improvement of the landscape, the transformation of the slope and the reconstruction of the embankment, and the construction of the embankment road. Through landscape design, we create a variety of ecological waterfronts, combined with pedestrian walkways and water-friendly boardwalks, to create a natural and wild water-loving landscape; five cruise ship docks are laid out on both sides of the riverbank, combined with the viewing platform to create an urban riverfront park with the characteristics of the new district.

The river water environment improvement project and landscape improvement project are closely combined with the water conservancy design, through the interception of the first rain, the rational allocation of internal and external water sources, the construction of living water replenishment channels, improve the quality of the regional water environment, improve the quality of the regional environment, and at the same time give the site ecological functions, in accordance with the design concept of "three seasons of colored forests, seven brilliant places, waterfront flower slopes", to create a green waterfront corridor. The project also combines the site conditions to create landscape nodes, and lays out waterfront trails, water platforms, docks, etc.

Under the condition of meeting the "scenery of the four seasons", combined with important landscape nodes such as cruise ship docks, the river selects some landscape plants with better ornamentality as the main scenery, and sets up characteristic nodes with different plant themes; there is a full line of water walking trails on the shore, which are combined with the hydrophilic platform and paving platform to build a multi-level roaming system; the night scene lighting facilities are arranged on both sides of the river to facilitate tourists to stroll leisurely at night. Every detail has been polished in every way, which can be described as a step by step, step by step.

Puwu Road has been opened to traffic at present, but due to the construction needs of the Puzhen Street Underpass Project and the second phase of Metro Line 4, the two nodes are detoured through the side road according to the construction conditions on the site. The specific route layout is:

1. North to south (Pearl Street to Qiliqiao North Road): Puwu Road - North side of Puzhen Avenue (to turn around along Mountain Avenue) - Sidewalk on the south side of Puzhen Street - Puwu Road (through Metro Line 4 Phase II Directional Hebei Station Construction Area)

2. South to north (Qiliqiao North Road to Pearl Street): Puwu Road - Dingshan Street Bridge - Diding Road - Xizhuang Pump Station Bridge - Puwu Road - Puzhen Street detour

During the construction period, the sidewalk may be partially adjusted according to the site conditions, and vehicles should follow the on-site instruction signs to pass in an orderly manner.

Proofread sheng yuanyuan

Source: Purple Cow News

Read on