laitimes

Changfeng power supply: service optical storage and charging integrated charging station

"Usually pay attention to check whether the muzzle connection is firm, and the idle gun head should not be arbitrarily pulled on the ground to avoid causing safety hazards." On December 15, at the integrated charging station of light storage and charging at the second headquarters of Shuangjie Electric in Xiatang Town, Changfeng Power Supply, the staff of Changfeng Power Supply did a comprehensive "physical examination" for the charging pile to ensure the safe and stable operation of the equipment.

Changfeng power supply: service optical storage and charging integrated charging station

Shuangjie Electric optical storage and charging integrated charging station was completed and put into operation on October 22, through the "light pile" to achieve new energy, energy storage, intelligent charging coordination support, including power supply and distribution system, rectifier system, photovoltaic system, energy storage system, charging system, station control monitoring and other modules, set clean energy two-way routing, supply and demand side control, grid energy friendly interaction and other functions in one. "The charging station has 20 DC charging piles and 34 AC charging piles, and the capacity of one charging pile is 60 kilowatts, and a new energy vehicle can be fully charged in an hour." Wang Huigang, an electrical engineer at Shuangjie, said: "At present, 13,582 photovoltaic modules have been laid in the factory area, with a total capacity of 5.875 megawatts. ”

Changfeng power supply: service optical storage and charging integrated charging station

In the implementation of the "double carbon" goal and the promotion of the construction of the shuangjie electric optical storage and charging integrated charging station, Changfeng power supply is in the forefront of service, opening up a "green channel", so that enterprises can build with peace of mind, so that new energy owners can charge with confidence.

In the next step, Changfeng Power Supply will continue to do a good job in the safety inspection and operation and maintenance of county charging facilities, ensure the normal operation of charging piles and the charging efficiency of electric vehicles, and use practical actions to promote the achievement of the "double carbon" goal. (Liu Bing)

Editor: Liu Shan

【Source: Xinhua News Agency client Anhui Channel】

Read on