When will the traffic light damage be repaired?
People *** 2021-10-13 09:57
Hello, the traffic lights in the four directions at the intersection of Putai Road and Xindong Road are all broken, broken for a month, and there has been no maintenance, because there is no traffic light, and traffic accidents often occur at this intersection. I called the mayor's hotline and 110 have reflected no less than 10 times, the operator has been saying to the relevant functional departments to reflect, please ask when will the traffic lights at this intersection be repaired? On the west side of the intersection of 106 National Highway and Subei Road (50 meters east of the location of the old vehicle management office in Puyang City), a traffic light is missing, which should have been removed in 2018 when the 106 National Highway was repaired to the right turnway of Subei Road, and then the right turnway was repaired but the traffic light has not been reinstalled. I have reflected many times to the mayor's hotline, 110 and the oilfield public security bureau hotline, but after three years, this traffic light has not been reinstalled, causing a lot of inconvenience to the vehicles along Subei Road from east to west to the intersection of National Highway 106, and there are also great safety risks.
The traffic light at the intersection of National Highway 106 and Kam Tin Road from south to north (north side) may have been hit by a large truck, damaged, and broken for several months without maintenance, when will this traffic light be repaired?
The intersection of Yellow River Road and Wenming Road has placed a temporary movable traffic light at the intersection since the repair of Wenming Road (Yellow River Road to Shengli Road) in 2019, and then it will be put away for two or three years, when will the fixed traffic light at this intersection be installed?
I reflected these traffic light problems are already chronic disease, have existed for a long time, we puyang city many traffic lights have second readers, but most of the second readers can not normally display readings, some display incomplete, some display garbled code, some simply black screen does not display. We Puyang City is going to meet the creation of a civilized city, and the traffic light infrastructure is so weak?
I hope that the road and traffic safety department of Puyang City can conduct a comprehensive inspection of the city's traffic lights (including oil fields) and completely solve the problem of low traffic lights, thank you for your attention in the busy time, thank you!
Reply
Puyang Municipal Public Security Bureau
Hello netizens:
Your message received.
First of all, I would like to thank the enthusiastic netizens for their letters and their support and attention to traffic management. The answer to this question is as follows:
The traffic lights at the intersection of Putai Road and Xindong Road mentioned in the problem have been repaired and resumed normal use. The signal lights of National Highway 106 and Kam Tin Road have been repaired and resumed normal use.
In the urban area of Puyang City, due to the old traffic light equipment at the intersection, most of the intersection traffic lights have been running for more than ten years, and there is indeed a part of the signal light failure problem, the traffic police detachment has arranged special personnel and operation and maintenance units to check the signal lights together, and use the 110 alarm station and other ways to collect the masses to reflect the signal light failure problem, and the fault signal light is repaired in time according to the procedure. In addition, the traffic police detachment is actively promoting the construction of the traffic signal control system of the smart traffic project, and the current construction plan has passed the expert demonstration, and is currently in accordance with the "triple one" procedure of the municipal bureau, after the audit, the municipal bureau will take the lead in entering the bidding process. In the plan, the new construction and transformation of 208 intersection signal lights in the urban area can realize the green wave control of trunk lines, regional coordination control and other methods, and join the intelligent operation and maintenance platform, and the faults of the front-end point can be found in time, dispatched in time, and repaired in time. We will continue to strive to improve traffic management as much as possible.
Reply time: 2021-10-22 08:10
Source: People's Daily local government message board
Editor: Wu Yu
Preliminary: Li Wenliang
Review: Xu Hongbo
Final Judgement: Wang Qijun
1. Circular on Strengthening Nucleic Acid Testing for Inter-Provincial Mobile Personnel
2. Official! @Puyang citizen public rental bicycle borrowing card refund started!
3. The latest progress of the first phase of the Puyang Greentown Expressway project is coming!