Sound International (00967) announced that despite the suspension of trading of the company's shares on the Stock Exchange, the Group's business is still operating normally.
According to the operational data collected by the Company, as of September 30, 2021, the Company has approximately 128 water supply and wastewater treatment projects in progress, with a total designed treatment capacity of approximately 3.5 million cubic meters per day. Of these ongoing projects, approximately 83 projects are operational and have a designed processing capacity of approximately 2.5 million cubic meters per day.
As one of The Leading Water & Wastewater Solutions Providers in China, the Company will continue to leverage its strengths and overcome possible operational difficulties.
Due to travel restrictions due to the COVID-19 pandemic, the Company is still preparing the Company and its subsidiaries' 2019 Annual Results, 2020 Interim Results, 2020 Annual Results and 2021 Interim Results. Based on the current progress of work, it is estimated that the 2019 annual results, 2019 annual report, 2020 interim results, 2020 interim report, 2020 annual results, 2020 annual results, 2021 interim results and 2021 interim reports will be available for release by the end of December 2021.