Source: People's Army
From Gyeonggi to the Sebei grassland
The train roared and the iron flowed
recently
A brigade of the Central Theater Army
Long-distance maneuvering is done by rail transport
Comprehensively improve the level and quality of precision delivery
In the early stage of railway transportation
The brigade was planning ahead of time
It has successively organized lectures on railway loading theory
Process specification and demonstration observation, etc
And solidly carry out the simulation training of "drawing the ground as a board".
Visited the loading station several times to conduct on-site surveys
Communicate and coordinate with the railway department
Prepare well and efficiently
A solid step forward for rail transport
Listen to the order and move
Starry Night Expedition Convoy
Slowly drive into the loading station at night
Vehicle marshalling, command on the board, guidance and positioning
Loading and reinforcement work was carried out in an orderly manner
Tie wires, twist steel cables, and make screws
The "Iron Guys" lined up neatly on the slabs
Always ready to cross the field
In between train stops
An inspection team consisting of the chief officer, the backbone of the squad leader and the driver
Conscientiously summarize the lessons learned from combing loading and reinforcing
Predict risks and hidden dangers in advance, and conduct safety inspections on a board-by-board and vehicle-by-vehicle basis
From the tightness of the chain
to the fixation of the wheel block
Meticulous and rigorous inspection
Tighten the loading reinforcement "safety valve"
Firmly grasp the "safety pass" of railway transportation
The wheels roll forward
The train sped past the military trains
Farther and farther away from the station
The officers and men are getting closer and closer to the "battlefield".
The next step of the brigade will be as planned
Complete various annual training tasks
Constantly temper your skills