laitimes

Create a new landscape of rivers and lakes to dress up the "back garden" of Loudi - Louxing District promotes the connection of water systems and the comprehensive improvement of rural water systems

author:Morning Loudi

Louxing District attaches great importance to the comprehensive improvement of water system connectivity, and has been listed by the Ministry of Water Resources and the Ministry of Finance as a pilot county (city) for the central government's 2020-2021 water system connection and rural water system comprehensive improvement. Since the implementation of the project, the district has taken "Shuimei Gaodeng River, Loudi Back Garden" as the theme, with the overall layout of "One Belt, Four Networks and Eight Projects", deepened the "five water co-governance", promoted the transformation from a single flood control irrigation to a comprehensive function of shuimei countryside, and gathered new momentum for rural revitalization.

Focus on rural revitalization and carefully plan the layout. In order to build rural rivers and lakes into happy rivers and lakes and provide an inexhaustible "water power" for rural revitalization, Louxing District strives to polish the business card of comprehensive improvement of rural water systems. The first is that the leader is in charge and the project is generated at a high level. The district party committee and the district government insist that the project is the element of the king's contention, seek big moves and make a fuss, plan ahead, conduct in-depth research and carry out project analysis and scientific demonstration; various departments are finely docked, grasp the industrial policies of the central and provincial financial and water conservancy departments, aim at investment orientation, ensure that the project can be reported, funds can be obtained, and "one chain" to promote the landing of the project. The second is to focus on the whole area and implement the project layout at a high standard. Louxing District organized relevant departments to study and inspect Zhejiang, Fujian, Jiangxi and other places many times, conducted in-depth research on regional conditions, fully solicited the opinions of the masses, and extensively carried out discussions. So that the project can not only ensure the safety of flooding, but also implement the concept of ecological protection, fully realize the integration and development of the industry, and the construction concept is closely related to the theme of happy rivers and lakes and rural revitalization. A high starting point and high standards determine the construction goals, select the Gaodeng River Basin to be included in the scope of water system connectivity and water beauty rural construction, and fully promote eight projects such as "river clearance project, river dredging and dredging project, shore slope improvement project, water system connection project, water source conservation and soil conservation engineering, pollution prevention and control project, landscape and humanities construction project, characteristic industry and tourism base construction project", directly benefiting 16 villages and benefiting more than 60,000 people. The third is to make every effort to tackle tough problems and promote the implementation of the project at a high speed. Establish the Louxing District Water System Connection and Shuimei Rural Construction Pilot County Work Headquarters, which is headed by the secretary of the district party committee and the district chief, to implement the "wall chart operation", the main leaders of the district party committee and government dispatch on Monday, the leaders of the district in charge of the district supervise every Wednesday, the headquarters office is dispatched every day, and the work WeChat group is announced on Monday, which is included in the "bi-weekly" scheduling, monthly evaluation and year-end performance appraisal of key projects in the whole region, and vigorously and orderly and rapidly promote project approval and construction. Give full play to the role of the masses as the main body, hire social quality supervisors to supervise the whole process, and comprehensively implement the "three cadres and five zeros" model of "cadres taking the lead, the masses voluntarily doing, cadres and the masses working together, zero profits in project construction, zero compensation for land occupation, zero remuneration for work output, zero obstruction of work in optimization environment, and zero petitioning for the satisfaction of the masses". The total investment plan of the project is 385 million yuan, and the total investment has been completed 369 million yuan, accounting for 95.84% of the project volume.

Gather funds to work together and accurately invest in implementation. Led by the central and provincial project funds, establish a diversified fund raising model of government investment, market financing and social financing, effectively embed and integrate with the construction project, and effectively ensure the smooth implementation of the project. At present, except for the central fund of 149.95 million yuan and the provincial release of 5 million yuan, the rest of the construction funds are all raised by the local government. Comprehensively completed 20 supporting projects such as tributary treatment projects, dredging and dredging, shore slope improvement, river dam treatment, shoreside treatment, as well as sewage treatment, toilet transformation, and smart agricultural parks. The first is to integrate agriculture-related funds. According to the central and provincial management measures for special financial funds, combined with the actual local situation, increase the overall integration of agriculture-related funds, and integrate various types of funds at the district level of 210.05 million yuan. The second is to introduce social investment. Docking enterprises in the river basin, actively guiding social capital to invest in the ecological environment governance and new agricultural industries in the Gaodeng River Basin, and introducing social investment of 34 million yuan. The third is to integrate asset resources. Using the government investment platform to adopt the industrial standardization plant construction model, the results of the reform of the rural property rights system in the Gaodeng River Basin were used to circulate more than 4,000 mu of land. Instead of investing with awards, the financial reward of Shantang Dredging District is 5,000 yuan / mouth, and the excess part is in the form of mass financing and labor, and 72 large mountain ponds and supporting ditches and supporting ditches are completed along the Gaodeng River.

Concentrate on capital performance, fine and standardized management. The first is to strengthen the special use of special funds. The district financial department is responsible for the management and supervision of funds and implements special account management; the district water conservancy department is responsible for the implementation and supervision and management of the project, strictly implements financial management, and establishes special accounts and sets special personnel. Strictly formulate the process of applying for payment of project funds, implement tripartite review by supervision, owner and command, adopt centralized payment from the national treasury, and allocate construction funds in full and in a timely manner according to the construction period and project implementation progress. The second is to strengthen the supervision of funds. Strengthen the project tracking review, fund tracking supervision, block the phenomenon of fraud and false reporting of the amount of projects, and strictly prevent the squeezing and misappropriation of funds, forming a multi-link supervision and management pattern of the whole process, and ensuring the safety of the use of funds. The third is to strengthen performance evaluation. Formulate performance targets for the eight major projects involved in the connection of the water system, adhere to the standard first, standardize the procedures, rely on the budget performance management system at the same level, further improve quality control measures, strengthen performance operation monitoring, strengthen the assessment system, and comprehensively improve the efficiency of project construction management and the use of funds.

Convergence of "five waters co-governance", exquisite ecological landscape. Deepen water safety, water resources, water ecology, water environment, water culture, through the comprehensive treatment of the Gaodeng River, the river dredging and dredging 167,000 square meters, the flood standard once in 20 years; the treatment of 8 tributaries, a total length of 4.6 kilometers; Shantang renovation of 91 mouths, channel renovation of 38, a total length of more than 50 kilometers. Along the Gaodeng River, it has become a beautiful rural landscape in Louxing District. First, persist in grasping the work of both sides of the strait at the same time. Ecological design such as ecological chain bricks and ecological retaining walls is implemented on the entire riverbank to create a "beautiful shoreline". Relying on the project ladder to promote the construction of ecological model roads for the zhihe River, the dredging and dredging of rivers and lakes and the penetration of transportation networks, 16 kilometers of revetments were newly built and reconstructed, and 20 kilometers of new mechanized ploughing trails were built. The second is to persist in treating the symptoms and the root causes together. The source of the Gaodeng River is treated with key treatment, the vanadium mine is closed, the slag is deeply buried, the mining area is fully re-greened, and the water source is conserved, so that the polluted mining area in the past has become an ecologically livable leisure tourism area, and the water quality of the Gaodeng River has reached Class III water quality from Class V to Class III. Carry out the construction of soil and water conservation projects such as landslide control of Shuangjiang Reservoir, construction of farmland returned to forests and wetland areas in Shanshan Village, and treatment of mudslides in Xinzhuang, with a comprehensive treatment area of 119km2. Construct plant protection belts and wetlands to make the forest coverage rate of the Gaodeng River Basin reach 66.2%, and achieve ecological and natural restoration. The third is to insist on dotting and contiguous films. Gaodeng River Jihe Garden, Huaxi Valley, Aoda Agricultural Park, Smart Agricultural Industrial Park, Mo Yandui and other efficient sightseeing agricultural parks, string points connected, connected into surfaces, more than 40 industrial base cooperatives along the Gaodeng River go hand in hand, the development of the agricultural industry is thriving. It has built a 24-kilometer eco-tourism slow walking path along the river from Shuangjiang Xinzhuang Village to Shanshan Jiyun Village, and built a boutique tourism area such as the Prodigy Cultural Park, the Small Hydropower Museum, the Shuangjiang Reservoir, the Hongjiashan Forest Park, and the Former Residence of He Guozhong to achieve the deep integration of culture, ecology and tourism. The construction of beautiful villages has moved from "one beauty" to "one piece of beauty". (Reporter Kang Chenggui Correspondent Zou Guodong)

【Source: Loudi News Network】

Copyright belongs to the original author, a tribute to the original

Read on