laitimes

Vice Mayor He Juntian investigated the construction of the Taojiang Water Conservancy Project

author:Morning Yiyang
Vice Mayor He Juntian investigated the construction of the Taojiang Water Conservancy Project

He Juntian listened to a report on the progress of the construction of the reservoir project and the situation of water storage

On January 19, He Juntian, vice mayor of Yiyang Municipal People's Government, came to Taojiang to investigate and guide the construction of water conservancy projects.

He Juntian successively went to the Keshang Chong Irrigation District, the Keshang Chong Reservoir, and the Taohuajiang Reservoir, inspected the construction of the reservoir's reinforcement and the construction of supporting projects for the continuation of the irrigation district, and listened to the reports of the relevant responsible persons on the progress of the construction of the reservoir project and the water storage situation.

Taojiang has a total of 219 reservoirs of the upper type, including 3 medium-sized reservoirs, 30 small I.-type reservoirs, and 186 small II.-type reservoirs, all of which have completed the first round of reinforcement, and are implementing the second round of reinforcement of Taohuajiang Reservoir, Keshangchong Reservoir, 2 medium-sized reservoirs and 6 small Type II reservoirs; a total of 50 irrigation areas, including 1 large irrigation area, 1 key medium-sized irrigation area, 3 general medium-sized irrigation areas, and 45 other small irrigation areas, and large and medium-sized irrigation areas have launched the continuation of supporting and water-saving transformation projects.

He Juntian pointed out that the construction points of the Taojiang Water Conservancy Project are multi-faceted and wide-ranging, and it is necessary to seize the favorable construction season under the premise of ensuring safety, plan in advance, organize scientifically, reverse the construction period, and solidly promote the construction of the project with quality and quantity. He stressed that the reinforcement of reservoirs is a major project for people's livelihood, and it is necessary to concentrate forces, strengthen management, optimize construction plans, speed up the progress of the project, and ensure that the construction tasks are completed on time and with high quality; it is necessary to strengthen supervision, timely acceptance, and ensure the quality, progress, and safety of the project; it is necessary to standardize construction, improve the basic ledger data, and ensure that the safety of the reservoir can withstand appraisal; it is necessary to strengthen the connection with towns and villages, combine the construction of water conservancy projects with beautiful villages and cultural tourism, help rural revitalization, and create a "smooth river, clear water, solid embankment, green shore, and beautiful scenery." water ecology.

(Second Instance: Mo Bin Supervisor: Lu Yan)

【Source: County Rong Media Center】

Copyright belongs to the original author, a tribute to the original

Read on