laitimes

Information | WEILAI's first overseas substation was officially operated in Norway, and 20 more will be laid out before the end of the year

author:Understand the CheDi report

Text: Understand the original Wei Wei of Chedi

Recently, the first substation set up by WEILAI in Norway was officially put into operation. It is reported that NIO will build 20 second-generation replacement power stations in Norway by the end of 2022, covering 5 major cities in Norway and major high-speed connecting roads.

The substation, located a few kilometres north of the southeastern Norwegian city of Drammen, was officially commissioned this month. This is a NIO 2.0 substation with 14 battery slots, including 13 battery packs and 1 empty slot.

Information | WEILAI's first overseas substation was officially operated in Norway, and 20 more will be laid out before the end of the year

Weilai second-generation replacement power station

Interestingly, on January 20, a video of a celebration ceremony suspected of having started operations of the station circulated on the Internet.

Information | WEILAI's first overseas substation was officially operated in Norway, and 20 more will be laid out before the end of the year

In the video, three men play saxophones, trumpets and mediators, the atmosphere is warm, and the door of the substation is slowly raised to the sound of performance, and an ES8 parked in the changing potential appears in the picture. Some netizens joked: "Less oh, no soul." ”

In addition, since January 14, Norwegian time, NIO has begun to push the new version of the intelligent operating system Aspen 3.0.5 NO to ES8 users in Norway. This is the first time that NIO has opened a remote firmware upgrade FOTA (Firmware Over-The-Air) outside of China.

Information | WEILAI's first overseas substation was officially operated in Norway, and 20 more will be laid out before the end of the year

Norwegian market ES8

It is understood that the intelligent operating system of the Nippon NT1 platform model is named Aspen, and the Norwegian ES8 is currently equipped with the intelligent operating system Aspen 3.0.0 NO customized for local users, and the system language is Norwegian and English. The new version of the intelligent operating system Aspen 3.0.5 NO will further enhance the winter travel experience of Norwegian users, including the addition of manual battery charging and warm-up in low-temperature environments and the extension of remote air conditioning warm-up time. In addition, this update also includes a series of content that optimizes the user experience, such as the new cruise mode power-up assistant and the new user feedback channel NOMI Debug.

Information | WEILAI's first overseas substation was officially operated in Norway, and 20 more will be laid out before the end of the year

NIO said that after entering the Norwegian market, NIO products and system-wide services will land in Many regional markets such as Europe and the Americas.

Read on