Oil worker construction, why there are so many construction steps, are to avoid the late latex paint cracking and other situations.
This is the top surface of my north bedroom with plaster plaster leveling, because before the treatment, there is a gap between the gypsum board ceiling and the top surface, such a gap needs to be filled in a large area.
The material on the top surface is composed of what components, perlite, putty powder, whitewash gypsum and other three different material components, so that the construction to the top surface, played an easy contact with the top surface, but also to ensure the flatness of the roof surface.
The top surface of the master bedroom also needs a large area of compensation, which is the space of the master bedroom, which is close to 20 square meters, and the top surface is supplemented by stucco plaster, which plays a certain leveling effect.
The pores on the gypsum board nails need to be filled with caulking plaster, especially the location of the V-shaped groove, consider scraping the grid first, and then applying the caulking plaster.
This is only the initial stage of oil construction, before the latex paint is painted, it is necessary to polish the whole room of the wall putty, and after polishing it, it is ready to paint the latex paint, such a construction process, in fact, is not simple at all, and the construction process is more understandable, but if it is really hands-on, it takes a lot of time and energy.
Especially the owners who have plans to renovate themselves, they should consider and understand the process of oiler construction, is this how your oiler is constructing?