Looking at how the house is built can give us a lot of inspiration. 20211118

author:Human speculators

This is a newly built house, in the construction phase, has been under construction for some time, and the construction of the foundation pit support pile is currently completed. The earthworks in the foundation pit were completed. The house is a concave building. As can be seen from the photos, the building is a basement floor and the depth of excavation is not large. And there is no engineering pile construction, it is a strip foundation, so it should not be a high-rise building, but only a few floors. Although it is only a few floors of the house, it takes a lot of time and energy.

At present, the excavation of the basement has basically ended, and it can be seen from the photos that there are support piles on all sides, and the support piles have been closed.

I will update the pictures every day, fix the same angle to take pictures, use pictures to show the progress of construction, and intuitively feel how the tall buildings were built.

By watching how the building was built, we can give us a lot of inspiration! We all know that the tall buildings are flat, but not many people know how to get up. How difficult is the construction, how hard the construction workers are, and how difficult it is to do one thing! It takes years to build a building from pre-formalities to completion, while demolition takes only a few hours. "Ten years of trees, a hundred years of tree people". It takes only a few minutes to destroy a tree, and it is enough to destroy a person in the same few minutes.

As can be seen from the photos of these days, the construction uses flowing water construction, first do the right part of the photo, and then do the left part of the pit. The advantage of flowing water construction is that it can save construction costs, of course, the construction cycle is extended.

As can be seen from today's photographs, the right and middle parts of the foundation pit have been poured with the concrete of the ground beam. And the formwork has been completely dismantled.

Only a part of the earthwork on the left of the foundation pit is piled in the middle of the foundation pit, located in the middle of the concave characters of the house, which does not affect the construction. A construction road was made using the remaining soil.

As can be seen from the photos today, the weather is very good and conducive to construction. However, there is no one on the construction site today. Work has been out of work for several days. Failed to live up to such a good weather, the estimated construction period is not tight, and all parties involved in the construction are not busy.

Looking at how the house is built can give us a lot of inspiration. 20211118

Read on