laitimes

Wang Xudong supervised and promoted the construction of key projects on the spot

author:Information News

On the morning of November 2, Wang Xudong, director of the district management committee, led the team to supervise and promote the construction of key projects, emphasizing the need to further enhance the sense of responsibility and urgency, seize the time node, strengthen the tracking service, overcome difficulties, really do solid work, and make every effort to promote the early completion, early production and early effectiveness of key industrial projects.

Wang Xudong inspected 8 key project sites such as the second phase of the Dana non-highway system, the second phase of the PARKnSHOP 24gw photovoltaic encapsulant film, and the Maverick automation equipment. Everywhere he went, Wang Xudong went deep into the project site, talked cordially with the person in charge of the enterprise and the construction party, listened carefully to the situation report, learned more about the progress of the project and the existing problems, and solved the problems on the spot.

Dana off-highway system phase II, PARKnSHOP 24gw photovoltaic encapsulant film phase II, ns automation equipment, IA automotive power semiconductor and other projects have been completed and put into production. Wang Xudong went deep into the production workshop, walked, watched, and listened, learned in detail about the production and operation of enterprises, market development, development planning, etc., encouraged enterprises to strengthen their confidence in development, give full play to the advantages of technical resources, actively raise elements, comprehensively develop the market, and accelerate bigger and stronger. "When will the device come in?" What other issues need to be addressed at this time?" At the site of the Canadian Solar 5gw battery project, Wang Xudong was concerned about the equipment ordering, entry plan, etc., and asked the enterprise to speed up the organization of equipment entry, and the park and related functional departments should take the initiative to dock and track services, actively help solve difficulties and problems, and create better conditions for the development of enterprises. Wang Xudong also came to the construction site of Xiaoniu Automation Equipment, Hengyuan 12gw photovoltaic modules, Wei bee 4gwh power batteries and other projects, listened carefully to the relevant situation reports, and the problems existing in the process of promoting the project on the spot, requiring the project investment entities to strengthen the time awareness, node awareness, scientific scheduling of resources, and fully accelerate the progress of project construction in accordance with the requirements of scientific construction, under the premise of ensuring safety and quality.

During the inspection, Wang Xudong stressed that it is necessary to increase the intensity of promotion, closely focus on the time node, reverse the construction period, hang up the chart, go all out to overcome difficulties, and ensure that the project is completed as soon as possible and produces results as soon as possible. It is necessary to strengthen efficient services, take the initiative to provide door-to-door and front-line services, timely help solve contradictions and problems in the process of enterprise development and project construction, and make every effort to ensure the construction of major projects. It is necessary to guard the bottom line of safety, strictly implement the responsibility system for safe production, and make overall plans for epidemic prevention and control, project construction and safe production to ensure the smooth progress of the project.

District leaders Yang Yikuan, Zhou Xiang and Tian Haibo attended.

(Source: Yancheng Economic and Technological Development Zone People's Government website)

Read on