Before and after the National Day holiday, according to the Zhejiang government affairs network,
Opening time of Baoshanqiao Station of Metro Line 5; Opening time of Liangmu Road Station of Future Science and Technology City; When will Exit C1 of Yuhang Road Station of Metro Line 16 be opened;
Can kindergartens be changed from private to public schools;
What are the preferential policies or subsidies for talents in Hangzhou to buy houses; why the second batch of centralized land supply in Hangzhou has been stopped in 17 cases; and how much is the discount rate after 10 years of affordable housing;
Whether the great white wall of xingwanli gongqu is not in compliance with the norms; whether Dingqiao will introduce Yintai; whether there is a farmers' market planning near the Binzhijiang River in Yuzhou has the latest official answers...
Look down.

keyword
Metro Line 5, Baoshan Bridge Station, opened
ask
Hangzhou Metro Line 5 Baoshan Bridge Station has been under construction for a long time, when can it be opened?
Reply (Hangzhou Metro Group Co., Ltd.):
After verification, Line 5 Baoshanqiao Station is scheduled to be completed in the second half of this year and has the conditions for opening.
Future Science and Technology City, Liangmu Road, open
Gaojiao Road is blocked every day, when can Liangmu Road be opened to traffic?
Reply (Yuhang District Future Science and Technology City Haichuang Park Management Committee):
The official opening of Liangmu Road (02 Provincial Highway - Wen'er West Road) is expected to be in the second half of 2022.
Line 16, Yuhang Road Station, Exit C1
Metro Line 16 Yuhang Road Station D1 entrance, at present, has been built to be opened.
When will the D1 entrance and exit on the south side of TianmuShan West Road of Yuhang Road Station be opened? It is better to facilitate the travel of the masses on the south side of Tianmushan West Road.
At the end of September, the C1 exit of Yuhang Road Station has been accepted for mechanical and electrical installation, and the rectification has been basically completed, and the surrounding supporting schemes are currently being docked. The specific opening shall be subject to the approval of the municipal government and the official announcement.
Kindergartens, private, public
Children do not adapt to the school, parents also have opinions on the school, how to change to a public kindergarten?
Reply (Yuhang District Education Bureau):
According to the Interim Measures for the Administration of Kindergarten Enrollment in Yuhang District (Yujiao [2018] No. 71), the current kindergarten enrollment and admission work has been fully completed, and according to the registration and admission rules, the admission result cannot be changed.
It is recommended that parents can actively communicate with the kindergarten or consult the enrollment of the nearest private kindergarten.
Hangzhou, college students, housing subsidies
I graduated in June 2020 and my household registration is Anhui. Now I plan to buy a house in Lin'an District, Hangzhou, do you have any preferential or subsidy policies?
Reply (Organization Department of Lin'an District Committee of the Communist Party of China):
(1) At present, Lin'an District gives a maximum of 8 million yuan and a minimum of 150,000 yuan to the newly introduced qualified A, B, C, D and E talents and full-time Botu and master's degrees.
(2) You can query the relevant talent identification standards in the "Lin'an Pro-Talent Code" application scenario in the "Hangzhou Citizen Card APP", or learn about the relevant policies by telephone consultation.
The second batch, concentrated out of the land, 17 cases terminated
On October 11, your bureau announced the termination of the listing and sale of 17 plots in the second batch of centralized land supply in Hangzhou, of which 10 plots were the pilot "competitive quality" plots of the previous "flow auction" and 7 were non-competitive quality plots.
What are the specific reasons for the termination of the listing and sale of these land plots?
Reply (Hangzhou Municipal Bureau of Planning and Natural Resources):
Due to the needs of the work, after approval, the listing and transfer of the above-mentioned land plots will be terminated.
Affordable housing, 10 years, policy
May I ask about affordable housing, can the money for commercial housing be reduced by 20% after 10 years?
Reply (Hangzhou Municipal Housing Security and Real Estate Administration):
After investigation, we understand that the feedback on the handling is as follows:
According to the Announcement of the Hangzhou Municipal Bureau of Finance of the Hangzhou Municipal Development and Reform Commission on the Announcement of the Assessed Price of Affordable Housing in Hangzhou (From September 12, 2021 to September 11, 2022) (Hangzhou Development and Reform Price [2021] No. 212), the discount rate is 2% per year, and the number of years is from the date when the buyer of affordable housing signs the purchase contract (including the pre-sale contract) to the date of payment of the equivalent price of land income to the tax authority (less than one year is calculated as one year), The maximum discount period for a house is 10 years, and the maximum discount rate is 20%.
The specific amount of land income equivalent that needs to be paid shall be subject to the result calculated by the processing window.
Stars, fair districts, great white walls
The contract did not stipulate that the public area would be painted with a large white wall, and the delivery was the first floor tile, which was actually all a large white wall.
Reply (Linping District Housing and Construction Bureau):
After on-site verification by the staff of the quality supervision station of our bureau, Hangchen Xing wanli community is currently in the main construction stage, and the public areas are not all tiled:
1. In the construction drawings of the project, the ground and wall of the first floor (first floor) are designed with tile paving, and the standard layer (above the second floor) is designed with the ground for tile paving, and the wall surface is painted.
In the future renovation stage, the developer said that the construction will be carried out according to the drawings.
2. The project has set up a model house on the 1st floor and 2nd floor of the 20# building on the spot, the wall of the first floor of the public area is tiled, and the wall of the second floor of the public area is white latex paint, which is consistent with the design of the drawings.
On the issue of wall construction standards in public areas, our bureau has urged developers to explain to owners.
Dingqiao, Yintai, Construction
There is news that Dingqiao Changmu will settle in Yintai, but I don't know if the news is true. If so, when are you planning to build it?
Reply (Dinglan Subdistrict, Shangcheng District):
It is understood that it is currently in communication and consultation with Yintai and is still in the planning stage.
Yuzhou Binzhi River, vegetable market, planning
Hello, I am the owner of Yuzhou Binzhijiang located in the West Lake District. After checking in, I found that there is no vegetable market nearby, is there any plan to build a new vegetable farm nearby? If so, where is the planned vegetable farm located?
Reply (West Lake Branch of Hangzhou Municipal Bureau of Planning and Natural Resources):
The nearest farmers' market to The Binzhijiang River in Yuzhou is located at the intersection of Fenghua East Road and Xuetao Road, with a straight-line distance of about 1.5 kilometers. Thank you for your understanding.