laitimes

Bao'an land space to improve quality and efficiency in the first battle of the 100-day offensive was successful

author:Shenzhen Business Daily

Reader/Shenzhen Business Daily reporter Li Dan Intern Lin Yongrun Correspondent Zhou Hui Ou Ruibin

On the morning of October 26, in front of Shenzhen Tenglian Electronics Co., Ltd. in Jiuwei Community, Hangcheng Street, Bao'an District, large excavators, engineering vehicles and other equipment entered the construction site, and bricks and other building debris fell in response. This is a scene of the centralized demolition operation of the housing expropriation project of the High-speed Reconstruction and Expansion Project (Hangcheng Section) of the Jihe-Load Expressway Reconstruction and Expansion Project.

Bao'an land space to improve quality and efficiency in the first battle of the 100-day offensive was successful

▲The picture shows the scene of the centralized demolition operation.

The Seventh Party Congress of Bao'an District proposed that ensuring the development of advanced manufacturing industry with high-quality industrial space is an important measure for Bao'an to continuously optimize the business environment. According to reports, Hangcheng Street will take the lead in providing all construction work surfaces within the specified time, which marks the first victory of the street in the "100-day offensive action to improve the quality and efficiency of land space in Bao'an District", and also takes the lead in completing the land preparation task of the first major project in the whole district.

After 33 days and nights of unremitting efforts, the first battle of the 100-day offensive was successful

Space is the foundation of development, and only with large space can there be great development. In order to create a world-class production environment and let good enterprises "have good space to land and good land to use", on September 30, Bao'an District officially launched the 100-day offensive action of improving the quality and efficiency of land space, and dispatched 100 cadres from all units in the region to the front line, cohesiveness and overcoming difficulties in the form of large corps operations.

"During the National Day holiday, we basically gave up rest, and we were busy studying and formulating expropriation plans, contacting owners and tenants to carry out expropriation signing matters..." Fu Jiali, director of the Office of the Propaganda Department of the Bao'an District Party Committee and deputy leader of the fifth working group of the Housing Expropriation Project of the Jihe High-speed Reconstruction and Expansion Project (Hangcheng Section), said that grass-roots work needs to face the demands of the masses, and sometimes there will even be some problems and contradictions.

According to reports, in the process of expropriating projects, Hangcheng Street strictly followed the overall requirements of the 100-day offensive plan of "project to people, piece by piece, according to nodes, and completion of tasks", and the elite troops and strong generals have sunk to the front line of the attack. After 33 days and nights of unremitting struggle, 13 backbones of the 100-day attack team of the Joint District of Hangcheng Street have efficiently completed the task of housing expropriation of the High-speed Reconstruction and Expansion Project (Hangcheng Section), collected 113 various buildings and structures, and the total building (projection) area reached 16,000 square meters.

Before the end of the year, complete 13 100-day offensive tasks to achieve land and other projects, space and other enterprises

"In accordance with the relevant requirements of the city and the district, all the requisition and demolition work and the provision of construction sites should be completed before the end of October, with tight time and heavy tasks." The leading cadres stationed in the districts and streets are fully engaged in the requisition and demolition work, which has a great guiding effect on the promotion of the project. According to Lin Gaosong, deputy director of the Hangcheng Street Office, next, Hangcheng Street will take this as a new starting point, continue to work hard, and make every effort to attack the Shenzhen Great Intercity (Hangcheng Section) and Huangtian Interests Coordination (Phase II) projects, and continue to expand the results of the 100-day offensive action.

Bao'an land space to improve quality and efficiency in the first battle of the 100-day offensive was successful

▲The picture shows the scene of the centralized demolition operation held in the Air-Load High-speed Reconstruction and Expansion Project (Hangcheng Section).

According to the deployment, Bao'an District will complete 13 100-day offensive tasks before the end of the year, including the completion of the annual land preparation of 2.43 million square meters, the construction surface of the handover machine and the lotus reconstruction and expansion project of 1.02 million square meters, the land preparation of Yanluo Whole Street (Phase I) of 1 million square meters, the raising of 1.1 million square meters of industrial (industrial) affordable housing, and the promotion of urban renewal (revitalization and utilization) of 1.4 million square meters in the Shajing Avenue area. According to reports, Bao'an District will accelerate the revitalization of land into pieces of land by vigorously carrying out the 100-day offensive action of improving the quality and efficiency of land space, realize land and other projects, space and other enterprises, to ensure the construction of major projects, and actively undertake the landing of high-quality enterprises and major platforms to promote the high-quality development of Bao'an's advanced manufacturing industry and firmly adhere to the "basic disk" of Shenzhen's industry.

Read on