laitimes

Jiangnan District: Weaving a dense "safety net" and fighting an "active battle"

author:Nanning Jiangnan release
Jiangnan District: Weaving a dense "safety net" and fighting an "active battle"
Jiangnan District: Weaving a dense "safety net" and fighting an "active battle"

The staff of Gangnam District inspected the points prone to geological disasters. In the past few days, all relevant departments in Jiangnan District have made every effort to do a good job in flood prevention and disaster reduction, and effectively protect the safety of people's lives and property.

The Jiangnan District Emergency Management Bureau urged the member units of the headquarters to do a good job in the investigation and rectification of potential flood prevention and safety hazards within the scope of the industry system, strengthen on-duty duty, and timely dispatch the duty situation of all towns and streets by telephone. At the same time, according to the yellow warning signal of meteorological thunder and lightning, the level IV emergency response for urban flood control will be activated in time and forwarded to all member units, and the member units will be notified to participate in the flood control consultation and scheduling meeting. The Jiangnan District Emergency Management Bureau continues to do a good job in flood control, guides and urges all member units to strengthen the investigation and management of hidden dangers, continues to carry out publicity, education and training, does a good job in the transmission and push of meteorological information, and continuously enhances the awareness of disaster prevention at all levels, and continues to do a good job in emergency information reporting to improve emergency response capabilities.

Jiangnan District: Weaving a dense "safety net" and fighting an "active battle"

The Jiangnan District Water Conservancy Bureau carried out flood control safety inspections at the site of the Liusi Reservoir Risk Removal and Reinforcement Project. (Photo courtesy of Jiangnan District Water Conservancy Bureau)

The Jiangnan District Water Conservancy Bureau has carefully analyzed and made careful arrangements, carried out in-depth and meticulous flood prevention inspections, and laid a solid foundation for safe flooding this year. Strictly implement the safety responsibility system of the three responsible persons for the reservoir, and carry out pre-flood safety inspections of reservoirs and flash flood hazard areas in the jurisdiction, focusing on the operation of dam spillways and water discharge facilities. At the same time, the bureau strictly implements the 24-hour duty system that combines the leadership with the shift and the staff on duty during the flood season, strengthens the investigation and management of hidden dangers, achieves full coverage of inspections and inspections, and effectively prevents all kinds of safety production accidents.

Source: April 25, 2024, Nanning Daily, page 4, Jiangnan District Emergency Management Bureau, Jiangnan District Water Conservancy Bureau

Text: Ruan Xiaoying, Zhao Bing

Editor-in-charge: Li Qian

Reviewer: He Yunshan

Produced by Jiangnan District Rong Media Center

Submission email: [email protected]

Jiangnan District: Weaving a dense "safety net" and fighting an "active battle"

Read on