In 2024, the construction of the water stop facility of the water conservancy gold test center of the first-class constructor will be a compulsory test center

author:Let's learn it

1) Construction of settlement joint filler

Filling materials: (1) asphalt linoleum, (2) asphalt fir board, (3) foam board, etc.

In 2024, the construction of the water stop facility of the water conservancy gold test center of the first-class constructor will be a compulsory test center

There are two installation methods: ➊ first installation method and ➋ rear installation method.

➊ First installation method: install the filling material first, and then pour the concrete. (Fill first)

➋ After-loading method: pour concrete first (pre-nailed long iron nails for installing filling materials), and then install fillers. (Afterpacking)

In 2024, the construction of the water stop facility of the water conservancy gold test center of the first-class constructor will be a compulsory test center

2) Water-stopping material

Metal materials: copper sheet, stainless steel sheet, aluminum sheet;

Non-metallic materials: rubber, polyvinyl chloride (plastic), etc.

In 2024, the construction of the water stop facility of the water conservancy gold test center of the first-class constructor will be a compulsory test center

The production of copper water stop should comply with the following provisions:

(1) Remove oil, floating skin and dirt from the surface.

(2) It is advisable to press and form with a compression die, and the corners and crosses should be made in the processing plant and leave an appropriate length

Straight section to facilitate on-site lapping; The seams should be welded firmly.

(3) When double-sided welding is used, lap or butt should be used for the welding of water-stop joints, and the lap length should not be less than 20mm.

(4) Protective measures should be strengthened for long-term exposure.

(2024 Edition: P139+101, Repeat)

3) Concrete pouring at the waterstop joint

(1) The horizontal waterstop should be in the middle of the pouring layer, at the elevation of the waterstop, and the <不得设置>construction joint.

(2) When pouring concrete, the <不得冲撞>waterstop, when the concrete will submerge the waterstop, its surface dirt should be removed again.

(3) Vibrator <不得触及>water stopper.

(4) The template of the embedded waterstop sheet should be <推迟>appropriately removed from the mold.

(2012[October](2), 2021(2B), 2013(1), 2023(1) cases)

In 2024, the construction of the water stop facility of the water conservancy gold test center of the first-class constructor will be a compulsory test center