Supervision job responsibilities are distributed!

author:New Future Featured Newsletter

First, the list of supervision responsibilities allocation

Supervision job responsibilities are distributed!
Supervision job responsibilities are distributed!
Supervision job responsibilities are distributed!
Supervision job responsibilities are distributed!
Supervision job responsibilities are distributed!
Supervision job responsibilities are distributed!

Second, the supervision of the work responsibilities

Supervision job responsibilities are distributed!
Supervision job responsibilities are distributed!
Supervision job responsibilities are distributed!
Supervision job responsibilities are distributed!

Equipment Supervision Engineer (Resident Supervision) Non-destructive Testing Engineer Responsibilities

1) Under the leadership of the director of the supervision department, responsible for the non-destructive testing management of the supervision department;

2) Implement the non-destructive testing management system and requirements formulated by the Supervision Department;

3) Review the technical and management documents of the NDT contractor and put forward audit opinions;

4) Carry out on-site inspection of the non-destructive testing contractor of the project, and require rectification if problems are found;

5) Analyze the results of radiographic testing, analyze and evaluate the welding defects, and submit the report of welding quality evaluation and prediction to the supervision department;

6) Study the technical and quality problems related to radiograph, UT and other detection in the construction of the project, put forward suggestions and opinions to the relevant units, and report to the supervision department;

7) Carry out spot checks (20%) of test negatives and data, and assess the work quality of non-destructive testing contractors;

8) Coordinate and manage the progress of non-destructive testing within the scope of the supervision department, and maintain the consistency of non-destructive testing and welding work;

9) Complete other tasks assigned by the supervising engineer.

Cost Control Engineer Responsibilities

1) Under the leadership of the director of the supervision department, responsible for the implementation of project investment control;

2) Participate in the preparation of the system documents of supervision and investment control, and be responsible for organizing the implementation of the supervision department;

3) Participate in the preparation of the project cost breakdown table, and prepare the cost budget limit for each stage;

4) According to the arrangement of the overall plan of the project, participate in the preparation of the project cost plan and the earned value system;

5) Participate in the risk analysis of project investment, find out the part of the project cost that is most likely to break through, the reasons and parts that are most prone to cost claims, and formulate preventive countermeasures;

6) Establish the engineering quantity account according to the engineering drawings, budget estimates and contract quantities, check the project measurement and project payment, analyze and compare the actual value and the planned control value, and submit the investment control report on a regular basis;

7) Review the corresponding expenses according to the approved design change order, project contact form, project visa, etc., as the basis for the approval of claims and settlements;

8) Review the progress payment, change, claim and project visa of the project under the jurisdiction of the supervision department;

9) Participate in project settlement;

10) Complete other tasks assigned by the chief engineer;

11) Submit a work report to the Superintendent.

Responsibilities of the test and testing supervision engineer of the supervision department

1) Sampling on-site witness. Witness at the site, and supervise the sampler of the construction unit to take samples according to the random sampling method and the specimen production method.

2) Witnesses should supervise the samples when taking samples on site.

3) The witness should seal and lock the sample himself.

4) If necessary, the witness should send the sample to the testing unit together with the construction tester.

5) The witness must sign the inspection order and present the "witness certificate".

6) The witness shall be legally responsible for the witness to submit the sample. Witnesses should abide by the relevant national, provincial, and municipal laws and regulations, as well as the relevant provisions of professional technical norms and standards, adhere to principles, resolutely standardize, seek truth from facts, and dare to resist undesirable phenomena. The witness shall be legally responsible for the representativeness and authenticity of the witness sample.

7) Witnesses should strive to improve their own qualities. Witnesses should strive to learn the relevant professional knowledge suitable for their work, master the random sampling methods of building materials, semi-finished products, etc., test items, quality standards, performance indicators and judgment methods, and constantly improve their technical level.

8) Witnesses should establish a witness sampling file.

Job Responsibilities of the Planning Supervision Engineer

1) Approve the overall construction schedule, cash flow plan and general description submitted before the commencement of the project, as well as various detailed schedules submitted at each stage of construction;

2) Approve the daily, weekly and monthly construction schedule in the project construction plan;

3) During the construction process, focus on inspection. Control the deviation between the actual schedule and the plan to ensure the smooth progress of the project;

4) When the project fails to be executed as planned, the contractor shall be required to adjust or modify the schedule, and the contractor shall be required to take necessary measures to speed up the construction progress;

5) Report the progress of the project to the owner on a regular basis.

Responsibilities of Surveying Professional Supervision Engineer

1) Under the leadership of the chief engineer, responsible for the survey supervision of the supervision contract section;

2) Fully familiar with contract documents, technical specifications, design drawings and various measurement and control reference points;

3) Responsible for providing the contractor with the original datum point, datum line and datum elevation and other relevant survey data in the drawings in writing, and conducting on-site inspection and organizing survey acceptance;

4) In conjunction with other professional supervision engineers, in strict accordance with the requirements of the technical specifications, the line, elevation, structure setting position and other comprehensive control, the development of the main structure of the positioning measurement and control measurement of the key points of the measures, the key parts should be retested, carefully do a good job of measurement and acceptance records and results sorting and keeping, and the measurement and testing results in a timely manner to notify the relevant professional engineers;

5) Review the contractor's construction survey plan and sub-project construction survey plan, and check their implementation;

6) Review the formal written survey report submitted by the contractor after the completion of the construction survey, and conduct on-site review according to the scope and content of the application.

7) During the construction process, review and urge the contractor to carry out measurement and control, and have the right to spot check the line type and elevation of any part of the project, and have the right to require the contractor to correct or suspend the construction if it is found to be unqualified;

8) Complete other tasks assigned by the chief engineer and the resident supervision engineer.

Contract Supervision Engineer Job Responsibilities

1) Fulfill the rights, responsibilities and obligations of the relevant project changes in accordance with relevant regulations;

2) The quality meets the provisions of the contract, the various data signing procedures are complete, and the content of measurement and payment in the construction bidding documents "Technical Specifications" is met, and meets the safety and environmental protection requirements, as a prerequisite for measurement and payment;

3) Carefully review the qualifications of any subcontractors of the contractor and the type and quantity of subcontracted projects, and put forward specific suggestions to be submitted to the chief engineer for review;

4) According to the provisions of the construction contract documents, on-site measurement and verification of the quantity and value of any completed works specified in the contract bill of quantities;

5) Inspect and supervise the composition of the contractor's main technical and management personnel, whether the quantity is consistent with the list listed in the contract, and report the inspection results to the chief engineer;

6) Review the interim payment certificate and the payment certificate of any payment after the termination of the contract according to the provisions of the contract and the authorization of the owner;

7) Supervise and inspect the quantity, specification and performance of the main machinery and equipment entered by the contractor according to the requirements of the contract;

8) Establish a measurement and payment supervision account, and regularly check and unify the account with the owner and contractor;

9) When it is considered that a breach of contract may occur, it should be reported to the chief engineer in a timely manner, and when a breach of contract occurs, it should be evaluated objectively and impartially in accordance with the provisions of the contract and relevant evidence, and the results should be submitted to the chief engineer for review;

10) Complete other tasks assigned by the chief engineer.

Supervisor Responsibilities

1) Carry out on-site supervision work under the guidance of professional supervision engineers;

2) Inspect the manpower, materials, equipment and their use and operation status of the contractor into the construction project, and make records;

3) Review or directly obtain the relevant data of engineering measurement from the construction site and sign the original voucher;

4) According to the construction drawings and relevant standards, inspect and record the process or construction process of the contractor, and record the results of the processing and production and process construction quality inspection;

5) Serve as a side station, find problems and report to the professional supervision engineer in a timely manner;

6) Do a good job of supervision logs and related supervision records.

Supervision Department of information clerk management responsibilities

1) Under the leadership of the chief engineer of the supervision department, carry out document control management;

2) Participate in the preparation of supervision document management system documents, and organize the implementation;

3) Responsible for the printing, proofreading, approval, sending and archiving of documents issued by the Supervision Department;

4) Responsible for summarizing the daily, weekly and monthly reports of each supervision contract, preparing regular meetings and special meeting reports, and submitting them to the person in charge for review and reporting to the owner's project department in a timely manner;

5) Responsible for the unpacking, sending, receiving, registering, sending and approving of technical documents, engineering documents (including drawings), letters and "miscellaneous items" inside and outside the supervision department;

6) Responsible for the transmission of engineering documents, the information adopts the counterpart information transmission, in order to avoid mistakes in the transmission of information, loss and delay in decision-making, and the issued documents must ensure that the other party has confirmed the receipt;

7) Manage all kinds of information and documents, each document should be registered and kept in both written and computer forms;

8) Classify documents and materials as required, establish an information query system to ensure that documents can be easily consulted;

9) Do a good job in the confidentiality of engineering documents and related information, and strictly implement the provisions of document borrowing;

10) Summarize daily, weekly and monthly reports of various projects and submit them to the project department on time;

11) Responsible for the management of the information platform of the Supervision Department;

12) Responsible for carrying out the management of completion data, and cooperate with the project department to organize the training of completion data management for all parties involved in the project according to the requirements of the owner;

13) Responsible for the collation of the completion data of the supervision department, and regularly inspect the collation of the contractor's completion data;

14) Complete other tasks assigned by the chief engineer of the supervision department;

15) Submit a work report to the supervising engineer of the supervision department.

Third, the work content and procedures of supervision before the start of construction

1. Establish a project supervision organization

1. The organizational form and scale of the project supervision agency shall be determined according to the service content, service period, project category, scale, technical complexity, engineering environment and other factors stipulated in the supervision contract.

2. Supervision personnel should include the chief engineer, professional supervision engineer and supervisor, and if necessary, the chief engineer can be equipped with a representative. The supervision personnel of the project supervision agency should be professional and complete the number to meet the needs of the project supervision work.

3. The supervision unit shall notify the construction unit of the organizational form, personnel composition and appointment letter of the chief engineer of the project supervision agency within ten days after the signing of the supervision contract. When the supervising engineer needs to be adjusted, the supervision unit shall obtain the consent of the construction unit and notify the construction unit in writing; when the professional supervision engineer needs to be adjusted, the chief engineer shall notify the construction unit and the contractor in writing.

Second, after the signing of the supervision contract, before the first site meeting, the professional supervision is responsible for receiving the following items from the company's business department:

1. Notice of winning the bid

2. Supervision contract

3. Organizational chart of project supervision

4. Letter of appointment of the chief engineer

5. The list of on-site supervisors and the copy of the title certificate and the employment certificate shall be stamped with the official seal

6. The copy of the business license, qualification certificate and Xinjiang registration certificate of the enterprise shall be stamped with the official seal

7. The registration book of sending and receiving documents and the sign-in form of the first site meeting

8. Office supplies required for the project (such as: safety helmet, manuscript paper, signature pen, project seal, witness sampling seal, steel tape measure, etc.).

9. Supervision diary

Third, the director of the organization of professional supervision to prepare supervision documents:

1. Supervision planning (should be prepared after signing the supervision contract and receiving the design documents, after the completion of the supervision unit responsible person for review and approval, and before the first site meeting submitted to the construction unit), its main content should include:

1.1 Project Overview

1.2 Scope of supervision work

1.3 supervision work content

1.4 supervision objectives

1.5 supervision work basis

1.6 The organizational form of the project supervision agency

1.7 Staffing plan of the project supervision agency

1.8 job responsibilities of the personnel of the project supervision agency

1.9 supervision work procedures

1.10 supervision methods and measures

1.11 supervision work system

1.12 Supervision facilities

2. Supervision implementation rules (professional supervision preparation, director approval), the main content of which should include:

2.1 Characteristics of professional engineering

2.2 The process of supervision

2.3 control points and target values of supervision work

2.4 Methods and measures of supervision

3. The main contents of the safety supervision plan should include:

3.1 Overview of engineering construction projects

3.2 Scope of work of safety supervision

3.3 Safety supervision work content

3.4 Supervision objectives

3.5 Basis for safety supervision

3.6 Staffing plan of the supervising institution

3.7 Responsibilities of the personnel of the supervision agency

3.8 Supervision work procedures

3.9 Safety supervision methods and measures

3.10 Supervision work system

4. The main contents of the implementation rules for safety supervision shall include:

4.1 Project Overview

4.2 Scope of safety supervision

4.3 Basis of safety supervision

4.4 The purpose of safety supervision

4.5 Responsibilities and authority of safety supervision

4.6 Allocation of safety supervision personnel

4.7 Implementation methods of safety supervision

4.8 Safety inspection and acceptance methods for the main construction processes

4.9 Safety supervision organization system and procedures

4.10 Safety Supervision and Assurance Measures

5. The main contents of the side station supervision plan should include:

5.1 The basis for the preparation of the supervision of the side station

5.2 Scope of side station supervision

5.3 The content of the supervision of the side station

5.4 Procedures for side station supervision

5.5 Responsibilities of the station supervisors

6. The main contents of the witness sampling system should include:

6.1 Witness the basis for sampling and inspection preparation

6.2 Scope of Witness Sampling

6.3 Witness the content of sampling and inspection

6.4 Witness the procedures for sampling and inspection

6.5 Methods of sampling building materials

6.6 Duties of Witnesses

4. Participate in the first regular site meeting

1. Before the start of the project, the supervisor shall participate in the first site meeting presided over by the construction unit;

2. The construction unit, the contractor and the supervision unit respectively introduce their respective on-site organizations, personnel and their division of labor;

3. The construction unit declares the authorization of the chief engineer according to the entrusted supervision contract;

4. The construction unit introduces the preparation for the start of the project;

5. The contractor introduces the construction preparation;

6. The construction unit and the chief engineer put forward opinions and requirements on the construction preparation;

7. The chief engineer introduces the main content of the supervision plan and emphasizes the supervision work procedures;

8. Study and determine the main personnel of all parties participating in the regular site meeting during the construction process, and hold the period, place and main topics of the regular site meeting;

9. The minutes of the first site meeting shall be drafted by the professional supervisor of the project supervision department and countersigned by the representatives of all parties at the meeting.

5. Participate in the design disclosure and drawing review:

1. Before the design disclosure, the supervising engineer should organize the supervision personnel to be familiar with the design documents, and put forward written opinions and suggestions to the design unit through the construction unit on the problems existing in the drawings.

2. The project supervisor shall participate in the design and technical disclosure meeting organized by the construction unit, and the chief engineer shall sign the minutes of the design and technical disclosure meeting.

6. The main content of quality control for the construction unit in the pre-construction preparation stage:

1. Review the quality management system, technical management system and quality assurance system of the on-site management organization of the contractor, mainly reviewing the following contents:

1.1 Confirm the effectiveness of the system to ensure the construction quality of the project, and track and check its adaptability in the implementation process;

1.2 Review the implementation of the organizational structure, staffing, responsibilities and division of labor of quality management, technical management and quality assurance (review focus);

1.3 inspection quality management, technical management system establishment;

1.4 Verify the qualification certificates and employment certificates of full-time management personnel and special operation personnel, and require the personnel and certificates to be consistent (review focus).

2. Review the qualifications of the subcontractor

2.1 Before the start of the subcontracted project, the contractor shall fill in the "Subcontractor Qualification Application Form" and submit it to the Project Supervision Department for review;

2.2 First of all, the business license, enterprise qualification level certificate, and special industry construction permit of the subcontractor should be reviewed (the focus of the review);

2.3 Review the performance of the subcontractor, mainly to check the similar projects that have been constructed recently;

2.4 Review whether the content and scope of the proposed subcontracted project conform to the content of the main contract (review focus);

2.5 Check the qualification certificate and employment certificate of the full-time management personnel and special operations personnel of the subcontracting unit, and require the personnel and certificates to be consistent (review focus);

2.6 For the subcontractor who has passed the examination, the subcontractor qualification application form shall be issued.

3. Confirm the measurement datum point and reference elevation and the quality control of the engineering survey pay-off.

3.1 Check the post certificate of the full-time surveyor of the contractor and the verification certificate of the measuring equipment (review focus);

3.2 Review the verification results of the control pile, the protection measures of the control pile, and the measurement results of the plane control network, elevation control network and leveling point;

3.3 After inspection, meet the requirements, sign the "Application Form for Inspection of Construction Survey Results";

4. Quality control measures for raw materials, semi-finished products, components and equipment required for the project.

4.1 Inform the construction unit of the name of the supervising witness, and urge him to go through the witness filing procedures;

4.2 Before purchasing, suppliers should be selected and quality standards should be clarified; Establish a procurement declaration system, if necessary, you can see the sample order; Require the factory to provide quality assurance documents (review focus);

4.3 For some important equipment, equipment or external components, you can take the way of supervising the production and manufacturing of the factory to carry out key or whole-process quality supervision;

4.4 Inspect and implement the storage measures formulated by the contractor according to the characteristics of materials and equipment to ensure that the storage conditions are met (review focus);

4.5 Before the materials and equipment enter the site, the contractor shall submit the "Engineering Materials/Components/Equipment Application Form" and its quality certification materials to the supervision department for review of the engineering materials, components and equipment to be entered;

4.6 supervision engineer shall enter the physical object in accordance with the entrusted supervision contract or the proportion specified in the relevant engineering quality management documents to carry out sampling inspection by parallel inspection or witness sampling;

4.7 The laboratory selected by the contractor shall be assessed from the following aspects:

(1) The qualification level of the laboratory and its test scope;

(2) Metrological verification certificate issued by the legal metrology department for the test equipment;

(3) the management system of the laboratory;

(4) Qualification certificate of the test personnel;

(5) The test items and requirements of the project.

4.8 for unqualified engineering materials, components and equipment without acceptance or acceptance of supervision personnel, the supervision engineer may issue a notice to the supervision engineer, prohibiting the use of the project, and ordered to rectify within the specified time.

5. In the pre-construction preparation stage, review the construction organization design, sub-project construction plan, method and process. (See how to review the construction organization design)

5.1 The construction organization design (construction plan) is a technical document prepared by the contractor, and the contractor shall be responsible for its preparation. The supervision unit focuses on checking its approval procedures (whether the signature and seal are perfect), whether the content is pertinent, whether it is comprehensive (such as: whether there is an external wall insulation plan, etc.), whether it is feasibility, effectiveness and reasonableness.

5.2 by the director of the organization of the relevant professional supervision engineer of the construction organization design sub-professional review, and finally by the director of the approval of the approval. For major or special projects (including construction plans), they should be reported to the center for review, and then the director will summarize and approve the contractor;

5.3 Precautions for review:

5.3.1 audit procedures: since the construction unit and the general contractor are one (the construction organization design is prepared by the general contractor), the technical person in charge and the declarant in the application form (Table B2-1) should be the chief engineer and project manager of the preparation unit (project department) respectively, and the "reviewer" in the "audit opinion of the construction unit" column is the chief engineer (or the person in charge of the technical department) of the superior legal entity;

5.3.2 The construction organization design should clearly state the progress, quality and cost control objectives in the main chapters, and should comply with the provisions of the construction contract;

5.3.3 Apply a special article to write about security controls. Including safety control objectives, safety guarantee system, safety technical measures, temporary electricity consumption and fire protection at the construction site...... programs, etc.;

5.3.4 should contain the key processes and special processes identified for the project; In addition to the formal sub-projects that have an important impact on the quality of the project, the key processes should also include important auxiliary projects, such as precipitation, deep pit support, high-rise outer shelves, etc. Under normal circumstances, the construction unit should be required to prepare a special construction plan as an integral part of the construction organization design.

5.3.5 In the selection of construction methods, attention should be paid to check whether the basis is correct; in the part of the calculation book, attention should be paid to check whether the assumptions are in line with the reality, and whether the conclusion meets the requirements;

5.3.6 The measures should be targeted and operable. For example: "The second pouring must be carried out before the initial setting of the concrete poured for the first time......"; After the strength of the beam concrete meets the requirements of the side formwork, it can be ......";" ...... Humidity must be controlled under conditions that meet the conditions of construction......". Another example: "The admixture solution should be prepared by a special person, and the solution of the specified concentration should be prepared first......"; The consistency of the mortar should be appropriately increased at room temperature ......";" Stir with sand for a certain period of time and ......" and so on. This kind of text description can be in the specifications and procedures, but not in the construction plan. Must be quantitatively described!

5.4 Determine the key parts and key processes of the project for side station supervision: the contractor is required to inspect the key parts, the construction technology of the key processes and the measures to ensure the quality of the project, report to the supervision department for review, and carry out side station supervision according to the side station supervision plan. During the construction process, when the contractor adjusts, supplements and changes the approved construction organization design, it shall report to the project supervision department;

5.5 When the contractor adopts new materials, new processes and new equipment, the contractor shall submit the corresponding construction technology measures and supporting materials to the project supervision department to organize special demonstration;

5.6 The above-mentioned plan shall be filled in by the contractor and submitted to the supervising engineer for review, and the supervising engineer shall approve and sign it;

5.7 Without the approval of the above plan, the unit, branch and sub-project shall not be constructed.

6. Control the quality and safe use of the main machinery and equipment used in construction.

6.1 Review whether the selection of the construction machinery and equipment to be entered is appropriate, and whether its performance meets the quality requirements and is suitable for the site conditions;

6.2 Review whether the number of construction machinery and equipment is sufficient and whether it is ready according to the approved plan;

6.3 For testing equipment (such as measuring instruments and scales) that need to be verified regularly, the contractor must have a metrological verification certificate issued by the statutory testing department (review focus);

7. Review and control the quality of the contractor's preparation work in terms of construction environment and conditions.

7.1 Check the auxiliary technical environment of construction operations, such as water, electricity, lighting, safety protection, roads, etc.;

7.2 Check the contractor's control of the natural environmental conditions on the site, such as waterproof, anti-freezing, wind, high temperature, etc.;

8. Pay attention to the verification of various equipment (such as elevators, distribution boxes, cabinets, pumps, etc.) and design data to ensure the accuracy of plane embedding.

7. The main content of safety supervision in the construction preparation stage

1. Review the enterprise qualification and safety production license of the construction unit, and check the signing of the safety agreement between the general contractor and the subcontractor

1.1 The establishment of the on-site safety production assurance system management organization of the construction unit shall comply with the relevant regulations, and the safety management objectives shall be clear and in accordance with the contract. The organization of the safety management and safety assurance system, including the number of project managers, full-time safety management personnel, special operations personnel, and safety qualification training certificates;

1.2 The construction unit shall establish and improve the construction safety production responsibility system, safety inspection system, safety operation procedures and accident reporting system;

1.3 The professional qualification certificate and safety production assessment certificate of the project leader of the construction unit shall be complete and valid;

1.4 The number of full-time safety production management personnel of the construction unit shall comply with the provisions of the construction administrative department, and its professional qualification certificate and safety production assessment certificate shall be complete and valid;

1.5 Verify the safety education and training records of the on-site personnel of the construction unit.

2. Review whether the safety technical measures or special construction plan in the construction organization design meet the mandatory standards, and only after passing the review can you agree to start construction, mainly reviewing the following contents:

2.1 Formulated the safety technical measures and electrical fire prevention measures of the temporary electricity scheme on the construction site;

2.2 Whether the construction site meets the relevant safety requirements;

2.3 Hazard monitoring measures and emergency plans for key parts and key links of the project;

2.4 Safety education plan and safety disclosure arrangement for construction personnel;

2.5 Plan for the use of security technical measures.

3. Review the special construction plan of the sub-project with greater risk, mainly reviewing the following contents:

3.1 The preparation, review and approval of the special construction plan are complete and valid;

3.2 The content of the special construction plan shall comply with the mandatory standards for engineering construction;

3.3 Where expert argumentation should be organized, there is already a written argumentation review report by experts, and the signature of the argumentation review report is complete and valid;

3.4 The special construction plan shall be improved according to the concluding opinions put forward in the expert argumentation and review report.

4. Review the special protection measures for the construction site and adjacent buildings, structures and underground pipelines.

4.1 The supervising engineer shall urge the construction unit to provide the construction unit with the construction site and adjacent areas of the above-ground and underground pipeline data and adjacent buildings, structures, underground engineering related information transfer.

4.2 Before the start of construction, the supervising engineer shall review the special protection measures for adjacent buildings, structures and underground pipelines formulated by the construction unit, and the supervising engineer shall sign the opinion on the "Construction Organization Design (Plan) Application Form". When the special protection measures do not meet the requirements, the supervising engineer shall require the construction unit to revise and re-submit for approval.

5. Whether the safety protection equipment, machinery and equipment and construction equipment of the construction unit meet the requirements of relevant national specifications.

6. Prepare safety supervision plan

6.1 safety supervision planning should be based on the requirements of laws and regulations, the characteristics of the project and the actual situation of the construction site, determine the objectives, priorities, systems, methods and measures of safety supervision, and clarify the name of the sub-project or construction site that should be prepared for the safety supervision rules.

6.2 The preparation of the safety supervision plan shall be presided over by the chief engineer, and the professional supervision engineer shall participate. The safety supervision plan shall be implemented after approval by the technical person in charge of the supervision unit.

6.3 The safety supervision plan shall be supplemented, modified and improved according to the changes of the project, and submitted for approval in accordance with the prescribed procedures.

7. Prepare the implementation rules for safety supervision

7.1 The project supervision department shall prepare the implementation rules for safety supervision in accordance with the requirements of the safety supervision program, and the implementation rules for safety supervision shall be operable.

7.2 Before the construction of the sub-project with greater risk, the implementation rules for safety supervision must be prepared.

7.3 The implementation rules of safety supervision should be based on the special construction plan prepared by the construction unit and the actual situation on the site, according to the work objectives and management system requirements proposed in the safety supervision plan, and clarify the division of labor and responsibilities of supervision personnel, the methods and means of safety supervision, the key points of safety supervision inspection, the frequency of inspection and the requirements of inspection records.

7.4 The preparation of the implementation rules of safety supervision shall be presided over by the chief engineer, and the professional supervision engineer shall participate, and the implementation rules of safety supervision shall be implemented after approval by the chief engineer.

7.5 The implementation rules of safety supervision shall be supplemented, modified and improved according to the changes in the project, and submitted for approval in accordance with the prescribed procedures.

8. The safety supervisor shall check whether the safety production preparation of the construction unit meets the conditions for starting construction, and sign the opinion in the review opinion column of the "Project Commencement/Resumption of Work Application Form".

8. Communicate with the construction unit in a timely manner and assist it in handling relevant procedures:

1. Assist the construction unit to sign a safety construction agreement with the construction unit;

2. Assist the construction unit to handle quality and safety supervision procedures;

3. Remind the owner to do a good job in the construction of "three links and one leveling" work and temporary occupation procedures;

4. Urge the construction unit to apply for construction permits;

5. Remind the owner to preside over the first regular site meeting and design disclosure and drawing review.

9. Review of the conditions for commencement:

The professional supervision engineer shall review the contractor submitted the project commencement report form and related information, with the following conditions, signed by the chief engineer, and reported to the construction unit:

1. The construction permit has been approved by the competent government department;

2. The land acquisition and demolition work can meet the needs of the project progress;

3. The construction organization design has been approved by the chief engineer;

4. The on-site management personnel of the contractor have been in place, the machinery and construction personnel have entered the site, and the main engineering materials have been implemented;

5. The approach road, water, electricity, communications, etc. have met the requirements for starting construction;

6. The construction safety review project has been reviewed and approved by the security inspection station.

10. Before the start of construction, the supervisor should prepare and collect the following information:

1. Information of the supervision unit:

1.1 Supervision and planning (construction, safety)

1.2 Supervision rules (civil engineering, equipment installation, electrical, progress, investment)

1.3 side station supervision program

1.4 Letter of Appointment of the Superintendent

1.5 The list of on-site supervisors and the copy of the title certificate and the work certificate shall be stamped with the official seal

1.6 The copy of the business license, qualification certificate and Xinjiang registration certificate of the enterprise shall be stamped with the official seal

1.7 Supervision diary

1.8 Minutes of the first meeting

1.9 Supervision Contract

1.10 Notice of Winning Bid

2. Information of the construction unit:

2.1 The business license, qualification certificate and safety construction qualification certificate of the enterprise shall be stamped with the official seal

2.2 Management, quality inspection, technology, safety personnel of the title certificate, work certificate copy of the official seal

2.3 Special types of work (electrician, welder, crane, scaffolding official seal)

2.4 Construction organization design and review form (classified according to construction, safety, and temporary electricity)

2.5 Witness sampling record form

2.6 Incoming materials and equipment inspection data

2.7 Special technical plan and application form (main sub-project construction plan and safety plan)

2.8 Laboratory qualification information:

2.9 Commencement/resumption of work application form and commencement report

2.10 Application form for inspection of construction survey results

3. The construction party provides information

3.1 Construction contract

3.2 Planning permits, red line maps

3.3 Geological exploration report

3.4 Construction Permits

3.5 Drawing triage records

3.6 Supervision station quality and safety supervision procedures

3.7 Investment license and project approval