laitimes

The municipalization reconstruction project of high-tech eighth road has the conditions for opening to traffic

author:Han News

New progress has been made in the municipal reconstruction project of high-tech eighth road (Wuyang Expressway colinear section), an important link of the Wuhan-Hubei Huanghuang "three horizontal and three vertical" expressway system, and the main road under the Wuyang Expressway viaduct has been opened to traffic.

The municipalization reconstruction project of high-tech eighth road has the conditions for opening to traffic

The EPC project of the high-tech 8th road municipalization reconstruction project (Wuyang Expressway colinear section) is 9.9 kilometers long, which is invested and constructed by Wuhan Hi-Tech Group China Investment Co., Ltd., and Wuhan Municipal Road and Bridge Co., Ltd. is responsible for construction. This road was originally a two-way four-lane road, due to the long construction period and the fact that there are many heavy vehicles transporting materials, the road surface is seriously damaged, and there are often potholes and water accumulation.

Wuhan Municipal Road and Bridge Co., Ltd. high-tech eight road project chief engineer Deng Haitao introduced: "After the road has been transformed and upgraded, it has become a two-way eight-lane urban trunk road, the road capacity and driving load have been significantly improved, and at the same time, a perfect water supply and drainage, electricity, communications, traffic security, street lighting system, etc., with the implementation of the greening project, beautify the surrounding environment and improve the comfort of the people." ”

The municipalization reconstruction project of high-tech eighth road has the conditions for opening to traffic

Since the start of the project, the project team has worked together to carefully organize all kinds of construction personnel and materials, reverse the construction period, and promote the completion of various tasks according to the planned nodes with project management, checklist promotion and full chain implementation. While rapidly advancing the construction progress of the project, the project department strictly controls the civilized construction management, keeps the bottom line of quality and safety, and vigorously promotes safe, green and civilized construction. The project has won many honors from the Hubei Provincial Department of Transportation on the construction of Wuhan New City and Hubei Huanghuang Expressway System in the fourth quarter, and the "six construction sites" demonstration project of party building, quality, safety, green, wisdom and civilization at the construction site in Hubei Province in 2023.

At present, the high-tech Eighth Road project is stepping up the construction of auxiliary roads, greening, lighting, etc., and the whole line is expected to be completed and opened to traffic in October this year.

The municipalization reconstruction project of high-tech eighth road has the conditions for opening to traffic

Yin Jun, the representative of the owner of the Gaoxin 8th Road Project of Wuhan Hi-Tech Group China Investment Company, said: "The municipal reconstruction project of Gaoxin 8th Road is an important part of the 'three horizontal and three vertical' backbone road network in Wuhan-Hubei Huanghuang metropolitan area, and the road will greatly alleviate the traffic pressure between Wuhan and Ezhou and improve the transportation and logistics capacity after the road is opened to traffic." At the same time, the opening of the road will improve the transportation network in the southern part of Wuhan New Town, Longquanshan Area and Honglian Lake Area, and contribute to the key skeleton road traffic in Wuhan metropolitan area. ”

Financial media reporter: Zhang Chao, Xu Tangjie Correspondent: Zhu Yingying

Editor: Zhao Qing, Lv Yanli

Read on