laitimes

15 days to complete the installation of curved canopy modeling of Class A difficulty Confidence case

author:Believe light pottery
15 days to complete the installation of curved canopy modeling of Class A difficulty Confidence case
15 days to complete the installation of curved canopy modeling of Class A difficulty Confidence case
15 days to complete the installation of curved canopy modeling of Class A difficulty Confidence case
15 days to complete the installation of curved canopy modeling of Class A difficulty Confidence case

Design renderings

SMOOTH AND SOFT CURVE SHAPE

————————————————

General Manager and Technical Director of Guangdong Zhixin

Wang Yungang led the team

On the site building structure and environment

Conduct an initial communication survey

15 days to complete the installation of curved canopy modeling of Class A difficulty Confidence case

When Guangdong Zhixin received the project, it had been less than 25 days since the opening time given by the owner, which means that from docking - on-site resumption - design deepening - material production, to on-site installation, our team must increase its full power in this limited time.

15 days to complete the installation of curved canopy modeling of Class A difficulty Confidence case

ADMISSION

DECORATION PROCESS

When the factory produced the modeling components, the first batch of installation masters arrived at the site to install the steel dragon skeleton, and all links had to be closely coordinated to complete the progress in order.

15 days to complete the installation of curved canopy modeling of Class A difficulty Confidence case

The entire curved canopy door floats 2.7 meters out of the wall, which was known during the preliminary survey that it was not difficult. The real difficulty is - "float out 2.7 meters without any cable-tie rods"!

15 days to complete the installation of curved canopy modeling of Class A difficulty Confidence case

To know that the construction of the steel dragon skeleton is to go through calculation, force analysis and support design to ensure the stability and safety of the structure, we structural engineers must ensure that the steel dragon skeleton remains stable under load, and can transfer and disperse load forces energy-efficiently!

15 days to complete the installation of curved canopy modeling of Class A difficulty Confidence case

But the strength of the team is strong, in the factory, on-site installation of continuous back and forth communication, our ULC lightweight ceramic also highlighted advantages, can achieve the immediate production of missing components, the fastest day-replenishment on the same day production and transportation, which is the traditional need for mold materials can not do!

15 days to complete the installation of curved canopy modeling of Class A difficulty Confidence case

(Effect after scraping putty)

15 days to complete the installation of curved canopy modeling of Class A difficulty Confidence case

(Effect after scraping putty)

This unique and creative door design, our ULC ultra-light ceramic material can be installed overtime for 15 days under the condition of rushing the construction period, assisting designers to turn the "effect" into reality!

15 days to complete the installation of curved canopy modeling of Class A difficulty Confidence case

ULC ultra-light ceramic as a special-shaped surface material, we have been assisting designers and customers to solve the problems of difficult surface modeling, long installation cycle, high cost, etc., hoping that this decorative material to realize the designer's "curved free modeling" can assist various creative designers to better land more complex surface projects!

15 days to complete the installation of curved canopy modeling of Class A difficulty Confidence case

———————————————————

Project Name: Educational Institution Curved Canopy Styling

Completion: 2023

Material service provider: Guangdong Zhixin Technology Environmental Protection Co., Ltd

———————————————————

—END—

15 days to complete the installation of curved canopy modeling of Class A difficulty Confidence case

Guangdong Zhixin Environmental Protection Technology Co., Ltd. is a manufacturer specializing in ULC ultra-light ceramic special-shaped decorative components, providing overall solutions for customers' large special-shaped and multi-curved building projects, assisting in project landing, integrating R&D, design, production, installation and surface treatment as one of the production-oriented enterprises, welcome project cooperation in various industries!

Read on