laitimes

The first professional catenary of the power supply project of the western extension of Guangzhou Metro Line 7 passed the acceptance

author:China Engineering Construction

On April 9th, an evaluation working group composed of personnel from Guangzhou Municipal Engineering Safety and Quality Supervision Station, Guangzhou Metro Group Co., Ltd. 3/10 Construction And Management Department, Guangzhou Metro Operation Headquarters No. 3 Center, Guangzhou Metro Design and Research Institute, Beijing Hyundai Supervision Co., Ltd., China Railway Qixi Mechanical and Electrical General Contracting Department and other relevant units conducted the first catenary project evaluation on the right line of the Linnan section of the Shunguang Metro Project Department of China Railway Wuhan Electrification Bureau.

The first professional catenary of the power supply project of the western extension of Guangzhou Metro Line 7 passed the acceptance

The acceptance team inspects the catenary bus

The right line of the rigid overhead catenary linnan section is 1003 meters long, and the catenary professional includes: buried members, support suspension installation, bus and accessory installation, overhead ground line erection, central anchor installation, electrical connection installation, grounding installation and other processes. At the acceptance site, the expert group conducted a comprehensive and meticulous inspection of each process, and verified the relevant internal industry information, and after comprehensive review, it was unanimously agreed that the catenary professional model project met the relevant standards and was approved.

The first professional catenary of the power supply project of the western extension of Guangzhou Metro Line 7 passed the acceptance

The acceptance team inspects the evacuation platform and ring network anchors

Shunguang Metro Project Department adheres to the construction concept of "model guidance, test first, first acceptance, and comprehensive promotion", implements model guidance, comprehensively creates excellence, and ensures the quality of the project. Since the professional construction of the catenary network, the project department has attached great importance to it, prepared a special construction plan in accordance with the requirements of the relevant construction technical specifications, strengthened the technical training of all employees, and strived for excellence. In terms of management, we always adhere to the "standardization, standardization and refinement" to ensure that the quality process "goes all the way up", effectively ensuring that the first piece of the process is excellent at one time.

Lei Renlong, deputy manager of the project department, said that in the future construction, we will continue to optimize the detailed process, improve the quality of the project, ensure the safety of construction, efficiently promote the construction progress, based on the standard, and higher than the standard, and strive to create a high-quality project of Guangzhou Metro! (Correspondent Wang Huigang Ye Ding)

Read on