laitimes

When Li Bo investigated the heating work in the central urban area of Yulin, he asked: to ensure the safety of the people and warm winter

author:Sissy News

On October 12, Li Bo, member of the Standing Committee of the Yulin Municipal Party Committee and executive vice mayor, successively went to the construction sites of Yushen Thermal Power Qingyun Power Plant, Yulin Heating Company, Kechuang New City Heating Relay Pump Station and Pipe Network Project to investigate the winter heating work in the central urban area and coordinate to solve existing problems.

During the investigation, Li Bo learned in detail about the progress of various preparations for heating enterprises such as coal-fired reserves, pipe network inspection and maintenance, etc. He demanded that all relevant functional departments and enterprises should improve their ideological understanding, strengthen overall planning and dispatch, consolidate work responsibilities, do a solid job in equipment maintenance and commissioning, respond to the concerns of the masses in a timely manner, and ensure that the broad masses of the people can spend the winter safely and warmly. It is necessary to adhere to precautions, improve and perfect emergency response plans, continuously improve the ability to deal with emergencies and extreme weather and the level of emergency disposal, and effectively improve the safety and reliability of heating. Under the premise of ensuring the quality and safety of the project, it is necessary to rush the construction period and grasp the progress, and ensure that the facilities and equipment under construction are completed and put into use as scheduled and run safely and stably. (YT01)

Read on