laitimes

Why is the central isolation pier of the east second ring road of Changsha misaligned? The Urban Management Bureau replied

author:Hotline for the people
Why is the central isolation pier of the east second ring road of Changsha misaligned? The Urban Management Bureau replied

Citizen Mr. Liu passed

Hunan Radio Iron Powder Life APP

Reflect to the "Hotline for the People"

Why is the central isolation pier of the east second ring road of Changsha misaligned? The Urban Management Bureau replied

Last year, the road section near the Duck Shop in Changsha's East Second Ring Road was upgraded and transformed, and the road after the transformation was spacious and clean, and beautiful. But I don't know why, the cement isolation pier in the middle of the road is placed in a twisted and crooked way, affecting the image. It is hoped that the relevant departments can arrange the cement isolation section of this section neatly.

Changsha Municipal Urban Management Bureau replied:

Changsha Duck Shop Bridge is a double bridge, south and north is not a plate, the central isolation pier above is mounted on two plates, the bridge is very high, after the force will shake, the isolation pier between the two plates is unevenly forced, time will be dislocated, this is a normal phenomenon, we will adjust every year. Under the existing design, the problem of misalignment of the central isolation pier cannot be cured, so last year, when we implemented the transformation of the central isolation guardrail from Renmin Road to Duck Paving in the East Second Ring Road, this section of the road was not changed.

The Yazipu Bridge is now a dangerous bridge, and the Changsha Municipal Development and Reform Commission and the Changsha Municipal Housing and Construction Commission have included the Yazipu Bridge in the scope of major repairs. In the next step, according to the opinions of the Changsha Municipal Development and Reform Commission and the Changsha Municipal Housing and Construction Commission, we have included this place in the scope of major repair and rectification, including the central isolation fence on the bridge will be redesigned, and it is planned to be transformed into a steel isolation guardrail to reduce the weight and force, which will play a protective role for the bridge and is relatively more beautiful.

Reporter: Pitting

Production: Gao Pengfei

Editors: Wang Xiangxue, Jiang Lan, Xu Shen

Read on