laitimes

Laoshan District Builds an Efficient Innovation Ecosystem to Empower High-quality Development to Accelerate Urban Renewal

author:Qilu discovered

Recently, in the construction of urban renewal, Laoshan District, Qingdao, has continuously built an efficient innovation ecosystem, accelerated the construction of 32 key projects with a total investment of 40 billion yuan, and promoted the completion and commissioning of a number of key projects such as the Virtual Reality Creation and Sharing Center, Sugon Global R&D Headquarters Base, and Artificial Intelligence Creation Center, so as to achieve the "acceleration" and new height of urban renewal in enabling high-quality development.

Inherit the gene of science and technology, grasp and promote the construction of urban renewal and the cultivation and expansion of new quality productivity as a whole, introduce 22 policies and measures to build a strong digital economy area, accelerate the construction of a new system of high-quality and efficient service industry and other policies and measures, continue to improve industrial policies, financial policies, land policies, and talent policies, and promote the realization of the goals of cultivating 1 new unicorn enterprise, 2 individual champions in the manufacturing industry, 3 specialized and special new "little giant" enterprises, and 6 gazelle enterprises. The total number of high-tech enterprises has exceeded 1,000, and the R&D investment intensity of enterprises above designated size has continued to maintain the leading position in the city.

  Build a high-quality investment promotion headquarters work system, improve the operation mechanism of the "chain length system" of key industrial chains, and build a "game of chess" investment promotion system. Actively explore the new model of "investment linkage", realize the whole chain of "fund-project-industry" attraction, deepen the application of platform investment and capital investment, and promote the industry to cluster into a group and agglomeration. This year, Laoshan District will promote the park to attract more than 120 projects throughout the year, and strive to introduce more than 100 projects with more than 100 million yuan.

  Improve the work system of "management committee + special class + platform company", promote the operation services covering the whole chain of industrial services, planning and research, brand promotion, etc., and make greater efforts to implement "industrial upstairs" to provide a solid guarantee for the high-quality development of the industry. In the next three years, we will build at least 20 talent homes to continuously attract and gather all kinds of enterprises and talents.

  The province's first urban construction project approval 123 mode

  The province's first urban renewal and urban construction approval service "123" model, that is, to promote urban renewal construction to achieve a new breakthrough in one overall goal, optimize and improve the approval service team and the bidding team, two teams to work together, and implement a new model of door-to-door service with zero errands, zero distance from policy interpretation, and zero delay in project approval. The examination and approval window was moved forward, customized approval services were provided for the construction project of the resettlement area in the Zhangcunhe area, more than 40 project through train services were carried out, and more than 60 problems such as bidding and construction permit procedures were solved on the spot.

  Launched the "1+1+N" menu-based approval mode, drawing an integrated full-product menu covering 84 approval items, leading the "acceleration" of the construction of Diaoyutai MGM Qingdao, virtual reality machines and optical module projects. Implement the reform of "one-time commitment and full-chain tolerance", apply for construction permits for 64 old community renovation projects in advance, and prepare for formal approval and shorten the approval time limit for projects that have completed the bidding procedures but do not currently have the conditions for handling construction permit procedures.

  Innovate the implementation of segmented joint acceptance and integrated joint acceptance, replicate and promote the "6+N" time-limited joint acceptance service model of "one-window acceptance, parallel handling, customized acceptance, and unified delivery" in the city, promote the early acceptance and early use of engineering construction projects, and provide "7*24 hours" all-weather service, whole-process assistance, tolerance acceptance, pre-approval construction guidance and other services, and accelerate the speed of construction project advancement, so far the construction permit processing rate of key projects at the two levels in the urban area is 94.9% and 81.1% respectively.

  The Polar Ocean World underpass was opened

  The Polar Ocean World tunnel on Donghai East Road in Laoshan District was opened before May Day. The project is located under Donghai East Road, east of Haiyou Road and west of Haijiang Road, using open excavation and underground excavation combined construction, the main passage of the new tunnel is about 42 meters long and 5 meters wide, with 2 passenger elevators and 4 escalators.

Laoshan District Builds an Efficient Innovation Ecosystem to Empower High-quality Development to Accelerate Urban Renewal

Renderings of the Polar Ocean World underpass

The tunnel is adjacent to the underground water body and aquatic life breeding area of the Polar Ocean World Scenic Area, and the construction cannot be excavated by blasting operations and noisy equipment. In order to ensure the smooth completion of the construction of the underground tunnel, Laoshan District optimized the project plan, combined with the geological distribution of the micro-weathered rock, and adopted low-impact construction by means of machinery + rhinestones, and at the same time, soundproof cover plates were set up at the open cut on both sides of the road, and noise monitoring in the scenic area was carried out regularly to control the noise within a controllable range. After the opening of the tunnel, the driving speed and traffic efficiency of the road nodes have been greatly improved, which has further alleviated the traffic congestion of the surrounding roads, and made it more convenient and safe for citizens and tourists to cross the road.

  The Virtual Reality Creation Center has entered the sprint stage of completion

  The Qingdao Virtual Reality Creation and Sharing Center project in Laoshan District has entered the final stage of completion, and more than 400 builders are advancing the construction progress in an orderly manner and making every effort to sprint to the completion node. The project is located in the east of Keyuan Jingliu Road, north of Xinhong Road and south of Keyuan Weisi Road in Laoshan District, with a total area of about 81 acres and a planned construction area of about 104,500 square meters.

Laoshan District Builds an Efficient Innovation Ecosystem to Empower High-quality Development to Accelerate Urban Renewal

Part of the renderings of the virtual reality industrial park

  During the construction, the project also introduced automatic health monitoring technology, set up health monitoring points at important nodes of construction, monitored and analyzed the deformation and stress of the structure, and generated dynamic curves in real time to ensure that the health status of the project was known and controllable in real time. After the monitoring of the construction period of the project is completed, the monitoring will continue to be carried out for more than 3 years during the operation period to ensure the delivery of the project with quality and quantity.

  5 new residential complexes share parking

  In order to effectively solve the problems of "parking difficulty" and "parking chaos", Laoshan District organized front-line personnel to find out the parking demand, dig deep into the existing parking resources, and integrate the idle parking space of the surrounding residential communities.

  After the opening of the above-mentioned residential parking lots, the parking pressure in Jinjialing Financial District, Laoshan District was effectively relieved, and the balanced distribution of parking space resources was realized. In the next step, Laoshan District will further expand shared resources, expand the scale of shared parking spaces, and effectively improve the quality of life and happiness index of residents.

  The Holiday Inn project has been capped

  The project is located in the west of Haier Road and north of Hefei Road, invested and constructed by the Beicun Community Neighborhood Committee of Zhonghan Street, Laoshan District, with a planned total investment of about 200 million yuan, consisting of a 16-storey hotel building and a hotel affiliated podium, with a total of more than 190 rooms. The community entrusts Intercontinental Group to operate this hotel, and it is estimated that the village collective will increase its income by 9 million yuan per year, which can solve about 60 jobs.

  A few days ago, the main structure of the project was capped, and after completion, it will gather many formats such as tourism and vacation, cultural experience, leisure and health preservation, and boutique commerce, and focus on creating a new regional cultural and artistic landmark, helping to improve the quality of Laoshan District and the development of cultural tourism industry.

  The Hongyuan resettlement area has entered the main construction stage

  Recently, the LS0902-068 plot in the Hongyuan Resettlement Area of Laoshan District has entered the main construction stage. The Hongyuan resettlement area is bounded by Binhai Highway in the west, Tianshui Road in the north, Planning Road in the east, and Dongsi Road in the south. The total investment of the project is about 2.201 billion yuan, the total area of the project is 92,700 square meters, and the total construction area is about 210,500 square meters, of which the above-ground construction area is 130,500 square meters and the underground construction area is about 80,000 square meters. Supporting the construction of roads, greening, squares, community services, property management and other facilities in the resettlement area. The Hongyuan resettlement area is scheduled to be completed in 2025 and will provide about 1,300 resettlement houses after completion.

  The Zhangcunhe resettlement area project is progressing steadily

  The project is located in the north of Changsha Road, south of Line 8, west of Keyuan Jingwu Road, and east of Qingyin Expressway, with a total construction area of about 180,000 square meters, and plans to build 15 residential buildings with 15 to 18 floors, as well as 1 public service supporting building, which can accommodate more than 1,000 residents. During the May Day period, more than 400 builders stuck to their posts to ensure the quality of construction by building model walls and dismantling processes.

  Hisense's new R&D center project has been announced

  Recently, the Hisense new R&D center project, located south of Jianxi Road and west of Songling Road in the inefficient area of Zhuzhou Road, has completed the pre-approval announcement of the planning plan. The project covers an area of about 278,000 square meters. The planned total construction area is about 464,300 square meters, of which the above-ground construction area is about 403,100 square meters. The land area of the third phase is about 48,100 square meters. The planned total construction area is about 93,700 square meters, of which the above-ground construction area is 69,800 square meters, and 5 factories, 3 dormitories and supporting buildings are planned.

  Liuqingwan Beach design plan publicity

  Laoshan District announced the intentional design plan of the Liuqingwan Bathing Beach project, and Qingdao will add another beach. According to the announcement, Liuqingwan Beach was built by the Shazikou Sub-district Office, and the project is located in Liuqingwan, Shazikou Sub-district. The mouth of Liuqingwan Beach is about 2.5 kilometers wide, the bay area is about 3 square kilometers, the beach is about 0.9 kilometers long, and the usable area of the beach is about 24,000 square meters.

  The land reference point of the planned sea area is east to the opposite side of the road into the village of Dongmaiyao Community, and to the south side of the parking lot of Ximaiyao in the west, with an area of about 15.52 hectares. There is no infrastructure construction in the bathhouse, and only 4 mobile observation decks and 800 meters of shark prevention nets are installed.

Read on