laitimes

China Railway 11th Bureau 5 Company News Overview (April 9 to April 15)

author:CREC China Railway Zhang Xin

Retrospective

1

The company held a special meeting on project management in the first quarter

Coordinate location: Shapingba, Chongqing

China Railway 11th Bureau 5 Company News Overview (April 9 to April 15)

Click on the image to see the news details

2

The company held a work deployment meeting of "positive style, ability improvement, and development".

Coordinate location: Shapingba, Chongqing

China Railway 11th Bureau 5 Company News Overview (April 9 to April 15)

Click on the image to see the news details

3

Wang Yuanqing went to the Beibu Gulf Water Resources Allocation Project to conduct a safety inspection

Coordinate location: Maoming, Guangdong

China Railway 11th Bureau 5 Company News Overview (April 9 to April 15)

Click on the image to see the news details

Spotlight

1

The Dazhou Railway Construction Headquarters and the Municipal Public Security Bureau went to the Dazhou Branch of the Chengdawan High-speed Railway to carry out the guidance of high-speed rail construction

Coordinate location: Dazhou, Sichuan

China Railway 11th Bureau 5 Company News Overview (April 9 to April 15)

On April 10, Yuan Yong, full-time deputy commander of the Dazhou Railway Construction Headquarters, and Li Sen, member of the Party Committee and deputy director of the Municipal Public Security Bureau, went to the construction site of the Tongbo River Bridge of the Dazhou Branch of the Chengdawan High-speed Railway for investigation and guidance. Yuan Yong and his entourage inspected the construction site of the Tongbo River Bridge, listened to the report on the construction progress, safety and quality of the project, and gave appropriate suggestions and opinions. (Wentu/Luo Shuaidong)

2

The Chongqing Rail Line 15 project has successfully launched the composite TBM between Happy Valley Station and Jiuquhe East Station

Coordinate location: Yubei, Chongqing

China Railway 11th Bureau 5 Company News Overview (April 9 to April 15)

Recently, the Chongqing Rail Line 15 project has successfully launched the composite TBM of the left line between Happy Valley Station and Jiuquhe East Station. In order to avoid the disturbance of the stratum by the on-site operation and affect the ground, the project department surveyed the surrounding environment in advance and used grouting to strengthen the weak stratum to effectively reduce the impact on the adjacent buildings within the construction scope. After the project is completed and put into use, it is of great significance to alleviate the passenger flow pressure of Chongqing's rail lines and optimize the transportation environment of citizens. (Wentu/Li Honghui)

3

The West Chongqing High-speed Railway 1 Project Department organized emergency management training

Coordinate location: Beibei, Chongqing

China Railway 11th Bureau 5 Company News Overview (April 9 to April 15)

On April 12, the Xiyu High-speed Railway 1 Project Department invited Yang Han, Deputy Director of the Fire Prevention Department of Chongqing Emergency Management Bureau, Yang Fei, Director of the Office of the Chongqing Emergency Management Comprehensive Administrative Law Enforcement Corps, and Li Shuangliang, Captain of the Investigation and Evaluation Team, to carry out special training on safety emergency management in the project department. Through this training, the knowledge of forest fire safety was popularized, the understanding of project management personnel and team leaders on the responsibility of safety production was deepened, and the sense of responsibility and urgency of doing a good job in safety production was enhanced. (Wentu/Zhou Xiao Shu Daxiu)

4

The project department of Qianjiang Chayuan Reservoir carried out an emergency drill for flood control

Coordinate location: Qianjiang, Chongqing

China Railway 11th Bureau 5 Company News Overview (April 9 to April 15)

On April 11, the Qianjiang Chayuan Reservoir Project Department, together with the local government and the owner's unit, carried out an emergency drill for flood control. Through this exercise, the flood prevention and flood control ability of the project department was effectively improved, the disaster prevention awareness and risk avoidance awareness of the project employees were enhanced, and the emergency support ability of the flood prevention and rescue team was exercised. (Wentu/Shan Jingyun)

Source: China Railway 11th Bureau 5th Company

Read on