Replace bridge guardrails, dredge bridge drains, and check elevator safety ...... In the past few days, the staff of the Municipal Facilities Management and Maintenance Center of the Haigang District have been busy repairing and maintaining the tunnel bridge of Hebei Street in Haigang District and the overpass escalator of Wenhua Road No. 7 Middle School, so as to optimize the traffic environment and protect the safety of citizens.
Replace bridge guardrails.
The Municipal Facilities Management and Maintenance Center of Haigang District continues to strengthen the maintenance of 22 urban bridges and culverts in its jurisdiction, actively organizes and carries out special maintenance operations, extends the service life of municipal facilities such as overpasses and railway culverts, and continuously improves the quality of maintenance of municipal facilities.
Painting the guardrails of the city bridge.
Dredging bridge drains. (Photo courtesy of correspondent Wang Chen)
Up to now, the Municipal Facilities Management and Protection Center of the Harbor District has repaired a total of 91 road disease points, repaired 185 square meters of bridge decks, anti-throwing screens and wall tiles, welded bridge railings and guardrails of 22 meters, and painted railings of 454.6 square meters. Strictly grasp the safety of the operation of overpass elevators, set posts and personnel, assign special personnel to conduct safety inspections, and carry out more than 200 safety inspections on 30 elevators and escalators of 9 overpasses such as Hebei Street Mall, Minzu Road Tianyang, and Wenhua Road Seventh Middle School, and repair all kinds of "micro" problems in a timely manner to ensure that the overpass disease remediation rate and elevator safety rate are 100%.
Reporter: Zhang Wan
Correspondent: Wang Chen
Co-ordinator: Tian Zheyi, Jiang Hong
Reviewer: Li Yong, Liu Han, Guo Chenrong
Editor: Li Zhicai
Editor-in-charge: Liu Fuqing
Supervisor: Wang Qing