laitimes

Daman Water Conservancy and Electric Power Management Office of Ganzhou District Water Affairs Bureau: The spring repair project has set off a boom to promote the revitalization of the people and farmers

author:Ganzhou Online

Ganzhou Rong Media News Recently, the spring ploughing preparation of the land of Ganzhou is in full swing, in the face of practical difficulties such as spring inspection and spring repair work in Daman Irrigation District, long lines, and tight time, the Daman Water Conservancy and Electric Power Management Office of Ganzhou District has made concerted efforts to repair and strengthen the damaged canal section of the backbone channel with one hand, and to grasp the maintenance and transformation of water diversion facilities and the dredging and cleaning of field channels with one hand, and go all out to catch up with the construction period, rush the progress, and grasp the quality.

Daman Water Conservancy and Electric Power Management Office of Ganzhou District Water Affairs Bureau: The spring repair project has set off a boom to promote the revitalization of the people and farmers

In order to ensure that the project maintenance tasks are completed with quality and quantity before the irrigation work begins, the cadres and employees of the Hydropower Department always stick to their posts and effectively control the progress and quality of the project. The first is to pay attention to safety. The Department of Hydropower attaches great importance to construction safety issues, and requires all construction sites to strengthen safety construction inspections on construction sites, and timely remind and correct safety problems when they are found. It is required that there are no illegal operations during construction, and preventive measures are strictly taken to prevent all kinds of safety accidents. The second is to focus on quality. In order to ensure the quality of engineering maintenance, the management office set up a spring maintenance working group, designated the person in charge of engineering technology and on-site quality responsibility, before the start of construction in a timely manner to do a good job in quality, safety, construction period and other technical disclosure work, reasonable arrangement of various construction tasks, to ensure that the construction content is completed on time with quality and quantity. The third is to grasp management. In view of the actual situation that the maintenance project line is long, it is required to set up a task force to follow the work according to the channel detailed inspection table and maintenance schedule to ensure that sporadic projects are not omitted and hidden dangers are accurately handled.

Daman Water Conservancy and Electric Power Management Office of Ganzhou District Water Affairs Bureau: The spring repair project has set off a boom to promote the revitalization of the people and farmers

Through the hard work of the whole department, the dredging and maintenance work of the key sections of the Daman Trunk Canal has been completed as scheduled, and the reconstruction project of the Twenty Fort Branch Canal is being implemented as planned. The Department of Water and Electricity also supervised and guided all water users to clean up and dredge the "capillaries" of the branch canals and the field channels below, which laid a solid "floor" for the annual irrigation work, strengthened the "embankments", dredged the "meridians", swept away the hidden safety hazards of water transmission through the channels, and provided strong water conservancy support for rural revitalization.

Daman Water Conservancy and Electric Power Management Office of Ganzhou District Water Affairs Bureau: The spring repair project has set off a boom to promote the revitalization of the people and farmers
Daman Water Conservancy and Electric Power Management Office of Ganzhou District Water Affairs Bureau: The spring repair project has set off a boom to promote the revitalization of the people and farmers

Read on