laitimes

NIO announced the opening of a high-speed power exchange network in the Greater Bay Area metropolitan area, with a total of 31 high-speed power exchange stations

IT Home April 14 news, today, Weilai announced the official opening of the Greater Bay Area metropolitan area high-speed power exchange network.

Weilai said that the high-speed power exchange network in the Greater Bay Area metropolitan area is centered on Guangzhou and Shenzhen, radiating Zhuhai, Dongguan, Zhongshan and other cities, with a total of 31 high-speed power stations, covering 18 major expressways such as G15 Shenhai Expressway, G4 Beijing-Hong Kong-Macao Expressway, and G94 Pearl River Delta Ring Expressway.

The specific layout of the high-speed power exchange network in the Greater Bay Area metropolitan area is as follows:

NIO announced the opening of a high-speed power exchange network in the Greater Bay Area metropolitan area, with a total of 31 high-speed power exchange stations

IT Home learned that as of April 14, WEILAI has built a total of 893 substations across the country, including 237 highway substations.

NIO announced the opening of a high-speed power exchange network in the Greater Bay Area metropolitan area, with a total of 31 high-speed power exchange stations

Delivery data shows that in March 2022, NIO delivered 9,985 new vehicles, an increase of 37.6% year-on-year. In the first quarter of 2022, NIO delivered 25,768 new vehicles, an increase of 28.5% year-on-year.

Read on