Recently, the Shenhai Expressway Cangnan Service Area Weilai New Energy Vehicle Replacement Power Station was officially opened, providing "one-click power exchange" services for new energy vehicles to smooth the highway.
Driver Mr. Wang through the mobile phone APP to find the car to drive to the Shenhai Expressway Cangnan service area, ready to replace the battery for his car, Mr. Wang told reporters that the entire power exchange process only takes about five minutes, compared with charging to save more than 20 minutes.
"Weilai is not a lot of service areas (substations) in the country, but there are several service areas, Cangnan is not the only one, in the service area is definitely more convenient, save to wait." The driver, Mr. Wang, said.
Driven by the national "double carbon" goal, new energy vehicles have entered a period of rapid development, which has higher requirements for the construction of basic supporting facilities such as public charging and substations.
Ke Huihui, assistant director of the Cangnan Service Area of Wenzhou Yongtaiwen Expressway Company, said: "In order to solve the anxiety of high-speed traffic and energy replacement, our company has continuously improved the charging service guarantee capability of the expressway service area, effectively solved the practical difficulties of high-speed charging difficulties and slow charging of new energy vehicles, and provided a variety of convenient travel options for new energy vehicle owners." ”
It is reported that at present, there is a Weilai second-generation replacement power station in the east and west squares of the Cangnan service area, and the station is equipped with 13 batteries, and the maximum number of power exchanges can be completed 312 times a day, and the service capacity is 3 times higher than that of the first generation of replacement power stations. The owner of Weilai new energy vehicle only needs to click the mobile phone APP or the power exchange button on the car, and the vehicle will automatically be parked into the power station to change the power.
"From the current operation situation, the peak of the Spring Festival Expressway in 2022, the highest reception and replacement service on the same day is more than 70 times, and the battery can be quickly completed in 5 minutes, so as to achieve fast change and go, and provide service guarantee for the high-speed smooth travel of new energy vehicles." Ke Huihui, assistant director of the Cangnan Service Area of Wenzhou Yongtaiwen High-speed Company, said.
Source: Hurry up Wenzhou APP County Channel Cangnan Rong Media Center
Preliminary Editor: Wu Tongtong
Editor-in-Charge: Ye Hong
Review: Qian Zhongbiao
Chief Producer: Chen Taisheng
Producer: Wu Xiao, Chen Xiyu
Director system: Chen Zhenshi