laitimes

The quasi-aerobic stepped landfill construction process is to put the garbage at different landfill heights ()A, sub-unit landfill and cover B, dump C in the horizontal direction, roll D round-trip, level, compact E, and point

author:Two build fighting

Quasi-aerobic stepped landfill construction process is to put garbage at different landfill heights ()

A. Sub-unit landfill and soil covering

B. Dump horizontally

C. Round-trip crushing

D. Flattening and compaction

E. Layered landfill and soil covering

BDE

Read on