laitimes

The Yanqing Division of the Beijing Winter Olympics has launched the "big closed loop" management during the games

Beijing, January 26 (China Youth Daily, China Youth Daily trainee reporter Wang Zhe) 100 Olympic-related points in the Yanqing Division of the Beijing 2022 Winter Olympics have started the "big closed loop" management of the game, and a set of efficient communication and linkage mechanisms inside and outside the ring have also begun to operate.

Liu Tao, director of the Liaison Office of the Comprehensive Security Group of the Yanqing Competition and director of the Yanqing District Bureau of Commerce, said that at present, all 39 catering service points in the Yanqing Competition Area have been opened, which can provide catering services for about 16,000 Olympic-related personnel such as athletes and team officials, various stakeholders, volunteers, transportation service support personnel, etc.

The Beijing Ice Sports Training Base in the Ring Also methodically guarantees the returning athletes and staff. According to the relevant person in charge, the ice base mainly guarantees the closed training and competition of the four national teams of snowmobiles, steel frame snowmobiles, sleds and alpine skiing. The support team will guarantee the nucleic acid testing sites, training venues and operating streamlines of the athletes in the base.

DoubleTree by Hilton Hotel Beijing Badaling, which undertakes accommodation and catering services for media broadcasters from various countries, has also entered a closed-loop operation since January 20. According to reports, through the "digital sentinel", the hotel security personnel can accurately verify the nucleic acid testing of the stationed personnel. The hotel is also specially equipped with professional robots for killing, information consultation and daily necessities distribution, and strictly implements the "one guest, one consumption" system.

In terms of peripheral service guarantee, Zhang Wenjing, director of the Comprehensive Department of the Winter Olympics in Yanqing Competition Area, introduced that medical and health security and transportation services are fully ready. In terms of command and dispatch, the professional support team of 1,400 people in the stadium and urban water, electricity and heat has been completed, and the urban operation and epidemic prevention and control work can achieve integrated command and dispatch.

In terms of medical treatment, the Winter Olympic Medical Security Center is managed according to the closed-loop management mechanism of "two types of people" (patients with symptoms related to infectious diseases such as fever and non-fever patients) (square cabin area, emergency area, outpatient area, and inpatient area), and the number of support personnel will be increased to 108 from February 3. In addition, the district has also set up 4 Olympic-related isolation points, reserve 162 rooms, and the medical emergency transfer work of the Olympic-related points is uniformly dispatched by the Beijing 120 Emergency Center.

In terms of transportation, Yanqing Division officially provides time transportation services from January 21. As a non-competition venue in Yanqing, Hanquan Comprehensive Service Center can integrate the Yanqing traffic command platform with the traffic command platform of the competition area to achieve a traffic command team, a set of traffic command system, a traffic operation streamline map and a traffic operation timetable.

Zhang Wenjing said that at present, the 260 support vehicles of the Operation Team of Yanqing Division have all been in place, and the low-temperature operation of hydrogen-powered vehicles in the Haituoshan Support Route is good.

The Yanqing Division of the Beijing Winter Olympics has launched the "big closed loop" management during the games

Source: China Youth Daily client

Read on