laitimes

Watch out for walls falling! Hefei citizens reported that there is a dangerous wall at the intersection of Tianshui Road and Lishui Road

author:Anhui net

Recently, the Xin'an Evening News, Anhui Net, and Dawan News reporters learned that some citizens reported that the wall of the Anhui Provincial Electric Power Repair Plant at the intersection of Tianshui Road and Lishui Road in Luyang District, Hefei City, was seriously damaged, and the wall was very high, cracking and aging, and in the event of thunderstorms, rain and snow weather, the dangerous wall may collapse. In this regard, the reporter made an on-site visit and learned about the situation with the relevant departments.

On-site investigation: small bricks, cement blocks, etc. scattered on the wall

On the afternoon of December 27, the reporter came to Lishui Road in Luyang District and saw a wall of more than four meters high in the Anhui Electric Power Repair Plant community, which was made of red bricks, and some cement blocks between bricks and bricks were protruding and scattered. The reporter noticed that the wall was narrow and wide, and on the platform protruding from the bottom of the wall, there were some scattered small bricks, cement blocks, sand and so on.

Watch out for walls falling! Hefei citizens reported that there is a dangerous wall at the intersection of Tianshui Road and Lishui Road
Watch out for walls falling! Hefei citizens reported that there is a dangerous wall at the intersection of Tianshui Road and Lishui Road

In addition, reminder signs were posted on the walls with the words "Beware of wall collapse". The reporter saw at the scene that the road near the side of the wall was not set up with non-motorized roads and sidewalks. At the intersection of Tianshui Road and Lishui Road, if you go along the right side of Lishui Road, pedestrians and non-motorized vehicles generally walk next to the wall.

Watch out for walls falling! Hefei citizens reported that there is a dangerous wall at the intersection of Tianshui Road and Lishui Road

Department response: After New Year's Day, the Social Housing Committee will take the lead in the renovation of the wall

On the afternoon of December 28, the reporter interviewed the relevant staff of Lindian Street in Luyang District, Hefei City. The staff member told reporters that the relevant person in charge of Lindian Street and the relevant person in charge of the Guantang Social Housing Committee had gone to the field on Saturday to inspect the situation of the wall and asked the community to come up with a renovation plan as soon as possible. At present, the construction plan has been basically prepared, including maintenance funds, etc., and the construction is prepared in the near future, and the sooner the better, as far as possible to complete it in a hurry.

According to the staff, the construction plan includes, first, to strengthen the existing wall, and second, to carry out comprehensive painting of the reinforced wall, including (in the later stage) the need to do some public service advertisements. After New Year's Day, next week, the Guantang Social Housing Committee of Lindian Street will take the lead in renovating the wall.

Xin'an Evening News Anhui Network Dawan News reporter Wang Yan photo report

Edited by Xu Dapeng

Read on