laitimes

Jinan Century Avenue will be rapidly transformed, and the planning of multiple traffic lines will be disclosed

author:Qilu one point

On December 3, the official website of Jinan Municipal Bureau of Urban and Rural Transportation published the reply to the reply of "Suggestions on Accelerating the Connection of Dongqiang Strategic Road Network" at the Fifth Session of the 14th CPPCC Municipal Committee, at present, South Industrial Road - Century Avenue has been included in the new version of the urban overall road network planning plan, combined with the plan, the future will be synchronously upgraded and transformed by Century Avenue, and a number of rail transit lines will be planned along Yueyue Avenue, Century Avenue and so on.

Jinan Century Avenue will be rapidly transformed, and the planning of multiple traffic lines will be disclosed

The reporter learned that the high-standard transformation and upgrading of Century Avenue and the synchronous planning and construction of rail transit are of great significance to the close connection between the urban area and Zhangqiu and the service of economic development along the line. At present, the first line of South Industrial Road - Century Avenue, as a quick passage connecting the central urban area to Zhangqiu, has been included in the new version of the urban overall road network planning plan, and a number of rail transit lines are planned along Feiyue Avenue and Century Avenue in the long term.

The "Reply" pointed out that at present, the preliminary plan of the plan is implemented in stages and in stages: in the early stage, the slow-moving transformation and upgrading of the section from the East Ring Road to the West Outer Ring Road of Zhangqiu and the optimization and upgrading of pipelines are carried out; in the medium and long term, combined with the design plan, the rapid upgrading and transformation of Century Avenue will be carried out synchronously to achieve the rapid upgrading of public transportation and cars.

In response to the problem of the eastern extension of the North Park Elevated Expressway, the "Reply" mentioned that the project has formed a preliminary design plan, but the route plan east of the West Juye River involves many sites such as the West River, ChengziYa, and the Ancient City of Dongpingling, which is difficult to implement and needs to be further deepened. At present, we are accelerating the preliminary work of the Guodian interchange to the Dadonghuan Longshan interchange, and the next step will be to use the revision of Jinan's land spatial planning, actively strive to adjust the nature of land use, and accelerate the promotion of the east extension of the North Park Elevated Expressway.

It is reported that in order to reduce the division of the city by the Jinan-Qingdao Expressway (Jinan to Weifang) Expressway and promote economic development along the line, the bridge-tunnel ratio of the Jinan section of the Jinan Expressway has exceeded 50%, and an entrance and exit have been added near the Jinan Botanical Garden, which can basically meet the needs of economic development along the line. The construction of the eastern extension of the tourist road has begun on May 29 this year, and Jinan will make every effort to accelerate the progress and strive to achieve the completion and opening of the Jiwei Expressway at the same time as the Jiwei Expressway in 2023.

Find reporters, reports, ask for help, major application markets download "Qilu OnePoint" APP or search weChat Mini Program "OnePoint Intelligence Station", more than 600 mainstream media reporters in the province are waiting for you to report online!

Jinan Century Avenue will be rapidly transformed, and the planning of multiple traffic lines will be disclosed

Read on