At 8 o'clock on December 4, China's easternmost high-speed railway, the Mujia high-speed railway (Shenyang to Jiamusi high-speed rail Mudanjiang to Jiamusi section), began to sell tickets. On December 6, the high-speed railway located in the alpine region will be officially opened. Mudanjiang to Jiamusi can be reached in the fastest 2 hours and 10 minutes, Harbin, Mudanjiang, Jiamusi three places constitute a high-speed rail ring line, China's northeast high-speed railway network is further improved, the people travel more convenient and fast.

Mujia high-speed railway is located in the eastern part of Heilongjiang Province, is the easternmost high-speed rail in China, the line from Mudanjiang City in the south, through Jixi City, Qitaihe City, Shuangyashan City, and finally to Jiamusi City, with a total length of 372 kilometers, a design speed of 250 kilometers per hour, with Mudanjiang, Linkou South, Jixi West, QitaiHexi, Huanandong, Shuangyashan West, Jiamusi 7 passenger stations, of which Mudanjiang and Jiamusi are existing stations.
The Mujia high-speed rail line crosses the branch of Changbai Mountain, and the whole line is located in an alpine area, with frost heave and snow damage, and the construction organization is very difficult. There are 173 new bridges and 34 tunnels on the whole line, with a total length of 209 kilometers, accounting for 56.3% of the total length of the line.
After the opening of the Mujia high-speed railway, the railway department will arrange 18 pairs of mobile train sets with a maximum operating speed of 250 kilometers per hour.
Source: People's Daily News