laitimes

The rail interchange station "pick-up, transmission, transfer" trilogy to do a good job of bus connection at the Expo

author:Shangguan News

【Source】Shanghai Metro Second Operating Company

Edit: Calvin_J

[Editor-in-charge of this issue] Papa Smurf Freya

【Editor of this issue】Shining inspiration

Expo rail transit

Feeder lines

In order to alleviate the pressure of the concentrated departure of passengers during the end of the Expo, three rail transit connection lines were also opened at Xujing East Railway Station (P1 parking lot of the National Exhibition and Convention Center) this year.

The rail interchange station "pick-up, transmission, transfer" trilogy to do a good job of bus connection at the Expo

"Strive for innovation in the routine" of the Jinyun Road Station short barge people

The rail interchange station "pick-up, transmission, transfer" trilogy to do a good job of bus connection at the Expo
The rail interchange station "pick-up, transmission, transfer" trilogy to do a good job of bus connection at the Expo

As the Jinyun Road Station of the short bus barge of the Expo site, the jinyun Road station continues the "pick-up, transmission and transfer" service trilogy of the previous three sessions, and strives to optimize and improve, taking into account that the bus barge is nearly 100 meters from the nearest station Exit 8, in order to provide passengers with fast and effective guidance and ensure the smooth passage, the station and Jiangqiao Street strengthen the surrounding environment improvement, add guidance signs and prepare luggage transfer vehicles and wheelchair cars in advance.

The rail interchange station "pick-up, transmission, transfer" trilogy to do a good job of bus connection at the Expo

In addition, a warm service desk is set up, equipped with an epidemic prevention medical box, built-in hand sanitizer, alcohol pads, Bondi and other epidemic prevention and rescue supplies, and provided to passengers in need if necessary.

The guardian of the subway who "upgrades safety to safety"

The rail interchange station "pick-up, transmission, transfer" trilogy to do a good job of bus connection at the Expo

The stations of Line 13 strictly control the passenger flow in and out of the station and the travel rules of the change of passenger flow, and timely do a good job in passenger flow guidance and large passenger flow organization.

The rail interchange station "pick-up, transmission, transfer" trilogy to do a good job of bus connection at the Expo

The crew professional dispatched special personnel to the turnaround point to supervise and assist the station to clear the passengers, the crew driver was on duty, the crew leader took turns to ensure the all-day transportation capacity, and they used a highly focused sense of responsibility to guard the first pass of passenger safe travel.

The rail interchange station "pick-up, transmission, transfer" trilogy to do a good job of bus connection at the Expo

The equipment professional increases the intensity of daily maintenance and inspection, strengthens the investigation and rectification of hidden dangers, and strengthens the emergency linkage of outsourced units.

Read on