laitimes

Li Jun, vice chairman of the Taiyuan Municipal Cppcc Committee, supervised the transformation of the old residential area of Jincheng Mining Construction Branch

author:Urban Focus

On October 29, Li Jun, vice chairman of the Taiyuan Municipal Committee of the Chinese People's Political Consultative Conference, and Li Hongwen, deputy mayor of Wanbailin District, went to the Construction Site of the Shanxi Economic Management Cadre College and the Old Quarters of the Electronics Factory Dormitory, which were built by jincheng Mining and Construction Branch, to supervise the construction site.

Li Jun, vice chairman of the Taiyuan Municipal Cppcc Committee, supervised the transformation of the old residential area of Jincheng Mining Construction Branch

At the site of the renovation project of the old residential area of the dormitory of The Shanxi Economic Management Cadre College, Li Jun inspected the asphalt pavement, greening, construction progress and project quality in detail. Li Jun demanded that coordination should be strengthened, especially to do a good job in the relocation of pipelines to ensure the smooth progress of the project; it is necessary to carefully craft, listen to the opinions of residents, do a good job in the normal management of the community, and gradually promote the improvement and upgrading of the living environment of the community, so that residents can live at ease, be happy, and rest assured, and improve the happiness index of residents.

Subsequently, Li Jun and his party came to the site of the renovation project of the old residential area of the electronic factory dormitory that the company participated in to build, to understand the safety, quality, progress and other conditions, and put forward guiding opinions on on-site safety management and the next step.

It is understood that at present, the transformation of the old residential area of the electronic factory dormitory is being paved with a stable layer of road water. All the construction personnel of the Mining Construction Branch overcame many difficulties such as narrow construction sites, cross-operations, traffic congestion, etc., and went all out to promote the progress of the project and ensure that it was fully completed by the end of the year. (Photo: Zhai Pengli, Yang Jiangang)

Source: Xishan Coal Power

Disclaimer: This article is reproduced for the purpose of transmitting more information. If there is a source labeling error or infringement of your legitimate rights and interests, please contact this website (e-mail: [email protected]), we will correct it in time. Thank you!

Read on