In order to further promote the construction of project quality engineering
Share good practices and experiences
Create a good atmosphere of "comparing, learning, catching up and surpassing".
May 14th
Changjin project was held
Observation meeting of the water stabilization construction site
Owners, supervisors, construction and other participating units
A total of more than 80 people participated
On-site visit to ZK837+500~800 water stabilized base construction observation point
At the event site, the engineering and technical personnel explained the splicing technology of the cement stabilized base of the new and old roads, the quality control and construction technology of the physical water stabilization project on the site, and introduced in detail the cleaning and wetting of the old road steps, the high-density cement slurry smearing the new and old road joints, the artificial feeding at the splicing place, the secondary cement slurry grout filling before the initial pressing, the rubber wheel rolling was increased twice at the joint, and the rolling completed the third grouting and other technical measures, which effectively solved the quality problem of the splicing quality of the water-stabilized base of the new and old roads, ensured the overall force of the water-stabilized base of the new and old roads, and improved the adhesiveness of the splicing surface. The compactness of the splicing is better, the core sample has no obvious holes, and the core sample across the seam is complete. All the observers gave full affirmation and high praise to the construction of ZK837+500~800 water stabilized medium and grassroots level.
This observation and exchange activity not only promoted the communication between the participating units, but also improved the level of project management. The Changjin reconstruction and expansion SSZ1 project team said that it would take this event as an opportunity to continue to adhere to the construction concept of high standards and high requirements, strengthen learning and exchanges, actively promote advanced experience and methods, comprehensively improve the quality and safety management level of the project, set up industry benchmarks, and win a good reputation.
Let's take a look
Changjin project construction site
New and old road cement stabilized base splicing "six-step method"
01
Clear the old road steps
02
The lap of the old and new roads is coated with cement slurry
03
Paving (manual feeding)
04
The second cement slurry is grouting before the initial pressing
05
Crushing
06
After the rolling is completed, the grout is filled three times