The construction of the Wangzhuang hub of the Fangtang Expressway Project across the Shanghai-Shaanxi high-speed steel box girder was successfully completed
1. Classification of post-wall grouting [formula] The post-wall grouting of the two-step water plugging segment can be divided into synchronous grouting and water plugging grouting according to the difference in the time and grouting purpose of the shield propulsion. 2. With...