Do you know which construction projects need expert argumentation?

author:New Future Featured Newsletter
Do you know which construction projects need expert argumentation?

Engineering projects that require expert argumentation

Do you know which construction projects need expert argumentation?

1. Foundation pit engineering

(1) Earthwork excavation, support and dewatering works for foundation pits (grooves) with an excavation depth of more than 5m (including 5m).

(2) Although the excavation depth does not exceed 5m, the geological conditions, surrounding environment and underground pipelines are complex, or the earthwork excavation, support and dewatering works of the foundation pit (groove) that affect the safety of adjacent buildings (structures).

Do you know which construction projects need expert argumentation?

2. Formwork engineering and support system

(1) Tool-type formwork engineering: including sliding formwork, climbing formwork, and flying formwork engineering.

(2) Concrete formwork support project: erection height of 8m and above; The erection span is 18m and above, and the total construction load is 15kN/㎡ and above; The load of the concentrated line is 20kN/㎡ and above.

(3) Load-bearing support system: It is used for full-hall support systems such as steel structure installation, and bears a single-point concentrated load of more than 700Kg.

Do you know which construction projects need expert argumentation?

3. Lifting, hoisting, installation and dismantling engineering

(1) Lifting and hoisting projects that adopt unconventional lifting equipment and methods, and the lifting weight of a single piece is 100kN and above.

(2) Lifting equipment installation projects with a lifting capacity of 300kN and above; Dismantling of lifting equipment with a height of 200m and above.

Do you know which construction projects need expert argumentation?

4. Scaffolding engineering

(1) Erection of floor-mounted steel pipe scaffolding projects with a height of 50m and above.

(2) Lifting height of 150m and above attached integral and sliced lifting scaffolding works.

(3) Cantilevered scaffolding projects with a frame height of 20m or more.

Do you know which construction projects need expert argumentation?

5. Demolition and blasting works

(i) Demolition works by blasting.

(2) Demolition of wharves, bridges, viaducts, chimneys, water towers or special buildings and structures that are likely to cause the diffusion of toxic and harmful gases (liquids) or dust, flammable and explosive accidents during demolition.

(3) Demolition works that may affect the safety of pedestrians, traffic, electrical facilities, communication facilities or other buildings or structures.

(4) Demolition works within the control area of cultural relics protection buildings, outstanding historical buildings or historical and cultural landscape areas.

Do you know which construction projects need expert argumentation?

6. Miscellaneous

(1) Building curtain wall installation works with a construction height of 50m and above.

(2) Steel structure installation works with a span of more than 36m or more; Grid and cable membrane structure installation projects with spans greater than 60m and above.

(3) Manually excavated piles with an excavation depth of more than 16m.

(4) Underground excavation works, pipe jacking works, and underwater operation works.

(5) The adoption of new technologies, new processes, new materials, new equipment, and sub-projects with greater risk for which there are no relevant technical standards.

Attached: Procedures for the meeting of the expert argumentation meeting

The following procedures are general procedures and may vary slightly depending on the region.

The expert demonstration meeting shall be organized by the general contractor of the construction unit according to the regulations, and the meeting shall generally be presided over by the project leader of the construction unit or the chief engineer of the supervision unit.

Do you know which construction projects need expert argumentation?

The following is the regular meeting procedure of the expert discussion meeting

Do you know which construction projects need expert argumentation?

1. Introduce the participants Participants generally include:

(1) The members of the expert group (the personnel of all parties involved in the construction of the project shall not participate in the expert demonstration meeting as experts), and there shall be no less than 5 or more experts who meet the relevant professional requirements;

(2) The person in charge of the project or the technical person in charge of the construction unit;

(3) Supervision unit, project director, engineer and related personnel;

(4) The person in charge of safety, the technical person in charge of the construction unit, the person in charge of the project, the person in charge of the project, the person in charge of the project, the person in charge of the project, the person in charge of the construction unit, the person in charge of the project, the person in charge

(5) The technical person in charge of the project and related personnel of the survey and design unit.

2. Introduce the general situation of the project

The construction unit undertaking the sub-project shall introduce the general situation of the project, and if the general contractor organizes the construction, the general contractor shall introduce the general situation of the project.

Mainly introduce the scale and characteristics of the project, the surrounding environment of the construction site and the construction conditions, etc., the introduction should be as detailed as possible, and the construction unit or supervision unit can be supplemented. The best way is for the participants to go to the construction site to check the site situation before the meeting, so that the expert group participating in the demonstration can fully understand the site situation. If the expert group is unable to arrive at the scene, it can provide on-site video data.

3. If the design plan is provided by a professional design unit, the design unit shall elaborate on the design plan.

4. The construction unit shall elaborate on the main contents of the special safety plan, including the basis for preparation, project overview, construction deployment, project organization, technical measures and calculations, emergency plans, etc.

5. The participating experts will conduct a preliminary review of the design plan and the special safety plan, and inquire about the relevant situation of the project, and the experts will put forward their own opinions. The main content of the expert argument:

(1) Whether the content of the special plan is complete and feasible;

(2) Whether the calculation and verification basis of the special plan conform to the relevant standards and specifications;

(3) Whether the basic conditions for safe construction meet the actual situation on site.

After the opinions of the expert group are put forward, the meeting will be adjourned for about half an hour so that the experts can unify and clarify the evaluation opinions.

6. After the resumption of the meeting, the leader of the expert group will read out the final opinions of the review, and the expert group will submit the demonstration report. Make clear comments on the content of the argument and sign the argumentation report. The report serves as a guide for the revision and improvement of the special plan.

7. Other parties express their views and opinions on the expert review opinions, and can ask the expert group if they have any questions.

8. Finally, the presiding officer of the meeting shall clarify the matters to be decided by the meeting, including the modification of the plan or the modification of the design.

Source: Supervision