laitimes

Li Guoying led the national general inspection team to inspect the flood control work of the Dongjiang and Hanjiang rivers in the Pearl River basin

author:Water conservancy in China
Li Guoying led the national general inspection team to inspect the flood control work of the Dongjiang and Hanjiang rivers in the Pearl River basin
Li Guoying led the national general inspection team to inspect the flood control work of the Dongjiang and Hanjiang rivers in the Pearl River basin

Li Guoying investigates Huizhou embankment

From 24 to 26 April, Li Guoying, deputy commander-in-chief of the National Defense General and minister of water resources, led a national defense inspection team to inspect the flood control work in the Dongjiang and Hanjiang rivers in the Pearl River basin. He stressed that it is necessary to conscientiously implement the spirit of General Secretary Xi Jinping's important instructions on flood prevention work and the concept of "two insistences and three changes" for disaster prevention, mitigation and relief, in accordance with the decisions and arrangements of the Party Central Committee and the State Council, adhere to the supremacy of the people and the supremacy of life, establish a firm bottom line thinking, limit thinking, based on flood prevention, resistance to major dangers, and disaster relief, always put the safety of people's lives and property in the first place, do a solid job in flood prevention and preparedness, and resolutely guard the bottom line of flood prevention and safety.

Li Guoying led the national general inspection team to inspect the flood control work of the Dongjiang and Hanjiang rivers in the Pearl River basin

Li Guoying investigates the Maple Dam Reservoir

Affected by the recent heavy rainfall, some rivers in the Pearl River Basin have experienced significant flooding processes. Li Guoying successively went to the Huizhou Embankment, Boluo Hydrological Station, Baipenzhu Reservoir, Xinfengjiang Reservoir, Fengshuba Reservoir in the Dongjiang River Basin, the Mianmian Reservoir in the Hanjiang River Basin, the Gaopi Water Conservancy Hub, the Chaozhou North and South Dikes, and Shantou Dawei to inspect the flood prevention and preparedness work on the spot, and analyzed and judged with local governments, water conservancy departments, river basin management agencies, and relevant personnel in the operation and management of water conservancy projects on the scheduling and application of water conservancy projects, rainwater monitoring and forecasting, and mountain flood disaster prevention.

Li Guoying led the national general inspection team to inspect the flood control work of the Dongjiang and Hanjiang rivers in the Pearl River basin

Li Guoying investigates the Cotton Beach Reservoir

Li Guoying stressed that it is necessary to anchor the goal of "no casualties, no dam collapse, no breach of important embankments, and no impact on important infrastructure", penetrate the defense of rain, water, flood and disaster conditions, strengthen forecasting, early warning, rehearsal, and plan measures, base ourselves on the most unfavorable situation, strictly implement flood prevention responsibilities and defense measures, go all out to do all aspects of flood prevention and preparedness work in a down-to-earth, in-depth and meticulous manner, take the lead in pre-emption, extrapolate the line of defense, and firmly grasp the initiative in flood prevention work. It is necessary to take the river basin as a unit, pay close attention to the evolution process of rainfall, production and confluence and flood by basin, strengthen rainwater monitoring, forecasting and information sharing around the safety needs of flood control protection objects, implement scientific, unified, joint and precise scheduling of reservoir groups in the basin, and give full play to the key role of the control reservoirs in the basin in flood regulation and control. It is necessary to refine and implement the defense measures for weak links such as floods in small and medium-sized rivers, mountain floods, and waterlogging in the region, improve the defense plan, preset rescue teams, equipment, and materials in advance, strengthen inspection, defense, monitoring and early warning, and study and judge high-risk areas in advance and transfer the people in dangerous areas in advance.

Li Guoying led the national general inspection team to inspect the flood control work of the Dongjiang and Hanjiang rivers in the Pearl River basin

Li Guoying investigates the Gaopi Water Conservancy Hub

Li Guoying pointed out that it is necessary to base ourselves on the present and focus on the long term, adhere to the problem-oriented and goal-oriented, give full consideration to various risk combinations, comprehensively examine the weak links in flood control, scientifically draw up flood control plans for river basins, speed up the construction of control reservoirs and embankments up to standards, and speed up the improvement of the flood control engineering system in river basins. It is necessary to coordinate the flood control safety of the reservoir area, dam body and downstream, strengthen the construction of the dam safety monitoring system, strengthen the governance of the reservoir area, especially the protection of flood control reservoir capacity, prevent and resolve risks and hidden dangers in a timely manner, and ensure the safety of the project and flood control. It is necessary to improve the "three lines of defense" for rainwater monitoring and forecasting composed of meteorological satellites, precipitation radars, rainfall gauge stations, and hydrological stations, strengthen the application of new technologies and equipment, optimize and improve the hydrological model of production and confluence, and the hydrodynamic model of flood evolution, so as to further extend the flood prediction period and improve the accuracy of flood forecasting. It is necessary to promote the construction of digital twin river basins and digital twin projects, and provide forward-looking, scientific, accurate and safe decision-making support for winning the modern flood control war.

Read on