The process of water and electricity installation in rural self-built houses can be carried out as follows:

1. Make a preliminary design according to the drawings or the structure and layout of the house. At this time, it is necessary to consider the structure and layout of the house, as well as the needs and habits of the occupants, and design the most reasonable water and electricity lines and layout.

Master the precautions in the process of water and electricity installation in rural self-built houses, and do not step on pits in rural buildings

2. Follow the main construction progress to do a good job of pipeline pre-embedding. It is necessary to bury water pipes, wire pipes, etc. in advance during the main construction process to avoid subsequent rework and unnecessary trouble.

3. After the completion of the main body of the self-built house, carry out water and electricity installation planning according to the owner's decoration requirements. At this time, it is necessary to carry out detailed water and electricity installation planning, make an installation list, and quote installation costs according to the owner's requirements and the actual situation of the house.

When carrying out water and electricity installation, you need to pay attention to the following:

1. After the water supply is installed, be sure to pump the water pressure to test whether there is any leakage. It is necessary to ensure that the water pipe connection does not leak, and a pressure test is required after installation to ensure the quality and service life of the water pipeline.

Master the precautions in the process of water and electricity installation in rural self-built houses, and do not step on pits in rural buildings

2. Toilet drainage should also be closed, irrigated, and tested for leakage. It is necessary to ensure that the toilet drainage pipe does not leak, and a closed irrigation test is required after installation to ensure the quality and service life of the toilet drainage pipe.

3. The electrical part will be tested on and off the cable as soon as the threading is completed. It is necessary to ensure that the wire is not short-circuited, and a power-on test is required after installation to verify whether the circuit is normal.

4. Make the joint in time. It is necessary to ensure that the wire connector is not loose, and regular inspection and maintenance are required after installation to avoid electrical accidents caused by aging or improper maintenance of the wire.

Master the precautions in the process of water and electricity installation in rural self-built houses, and do not step on pits in rural buildings

In short, the installation of water and electricity in rural self-built houses needs to follow the standardized design and construction process, and flexibly adjust the plan according to the actual situation to ensure the quality and safety of water and electricity installation.